In short

Solar installs in Costa Mesa by year

YearNew solar systemsWith a batteryBattery shareLeased or PPA
2026 (through Aug 31)15112482%40%
202518015888%52%
202419810051%33%
20234766313%18%
20223686117%23%
20212542610%31%
20201773017%20%
20191332821%17%
20181372216%23%
201714300%23%
201625600%51%

Net billing (NEM 3.0) began for SCE and SDG&E customers on Apr 15, 2023; most new systems since then include a battery.

What solar costs in Costa Mesa

Prices owners reported to the utility in 2024–2025, before incentives. The federal tax credit for homeowners ended Dec 31, 2025, so 2026 buyers pay these prices less any local rebate (see what's left).

FigureMedianMiddle halfSystems
Price per watt, solar only$3.70/W$3.10/W – $4.60/W100
Total price, solar + battery$38,450$26,725 – $50,375114
Solar size7.1 kW5.3 kW – 9.5 kW854
Battery size13.5 kWh13.0 kWh – 19.4 kWh321

Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).

How much a system here produces

Modeled for the Coastal Orange County climate, each kilowatt of south-facing panels makes about 1,650 kWh a year, so a median-size 7.1 kW system makes about 11,700 kWh a year. Source: PVWatts (National Laboratory of the Rockies), 20° tilt, 14% losses. Shade, roof direction and panel type change real output.

Who installs solar in Costa Mesa

Installers ranked by home systems connected in 2023–2025, from public records. This isn't an endorsement, and no one can pay to change the ranking. Check any license before you sign (how).

InstallerSystemsCSLB license
Sunrun206#750184 active
Tesla Energy Operations Inc41#888104 active
Sunpower Corporation Systems41#890895 check status
Freedom Forever LLC34#1029644 check status
Orange County Contracting Services31#1023627 active
Powur Home Construction19#1060243 active
Better Earth Electric Inc17#1024460 active
Enlightened Solar17#1064613 check status
Solar Optimum Design & Electrical16#972228 active
ESP Contracting15#619149 listed as: contr bond susp

All installers in Costa Mesa, with prices and battery share →

Equipment installed in Costa Mesa

The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.

Solar panelsShare of systems
Qcells27%
JA Solar13%
REC8%
LONGi7%
Canadian Solar6%
Inverter or battery systemShare of systems
Enphase43%
SolarEdge31%
Tesla15%
SunPower4%
Delta4%

Comparing home batteries →

Solar by ZIP code in Costa Mesa

ZIP codeSystems on recordNew in 2025With a battery
926261,80610990%
926271,2107185%

Your utility and solar billing

Solar permits in Costa Mesa

Costa Mesa issues home solar permits instantly online through SolarAPP+.

State law caps a home solar permit fee at $450 plus $15 per kW above 15 kW (Gov. Code §66015), and requires larger cities to offer instant online permits for home solar and paired batteries up to 38.4 kW (SB 379). Your installer normally pulls the permit. How solar permits work.

SolarAPP+ list checked Oct 1, 2026.

Questions about solar in Costa Mesa

How many homes in Costa Mesa have solar?

3,021 home solar systems are on record in Costa Mesa since 2001, including 180 connected in 2025.

Do new solar homes in Costa Mesa get batteries?

88% of the home solar systems added in Costa Mesa in 2025 included a battery.

How much does solar cost in Costa Mesa?

Owners who bought solar in Costa Mesa in 2024–2025 paid a median $3.70/W before incentives, about $26,300 for a typical 7.1 kW system. Solar with a battery cost a median $38,450 in total.

How long does the utility take to approve solar in Costa Mesa?

In 2025, the median time from the interconnection application to permission to operate was 57 days. That's the utility's step only; design and city permits come before it.

Who installs the most solar in Costa Mesa?

By public records, Sunrun connected the most home solar systems in Costa Mesa in 2023–2025. Rankings here are by count only; no one can pay to change them.

Which utility serves Costa Mesa?

Southern California Edison (SCE): net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.

About this data