In short

Solar installs in Silverado by year

YearNew solar systemsWith a batteryBattery shareLeased or PPA
2026 (through Aug 31)159——
2025281761%21%
2024292690%14%
2023421843%7%
202283——
202193——
202052——
201983——
201810——
201750——
201680——

Net billing (NEM 3.0) began for SCE and SDG&E customers on Apr 15, 2023; most new systems since then include a battery.

What solar costs in Silverado

Prices owners reported to the utility in 2024–2025, before incentives. The federal tax credit for homeowners ended Dec 31, 2025, so 2026 buyers pay these prices less any local rebate (see what's left).

FigureMedianMiddle halfSystems
Price per watt, solar onlytoo few to say7
Total price, solar + battery$28,150$27,500 – $41,50036
Solar size6.1 kW5.2 kW – 9.4 kW99
Battery size13.0 kWh12.0 kWh – 13.6 kWh61

Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).

How much a system here produces

Modeled for the Inland Orange County climate, each kilowatt of south-facing panels makes about 1,680 kWh a year, so a median-size 6.1 kW system makes about 10,300 kWh a year. Source: PVWatts (National Laboratory of the Rockies), 20° tilt, 14% losses. Shade, roof direction and panel type change real output.

Who installs solar in Silverado

Installers ranked by home systems connected in 2023–2025, from public records. This isn't an endorsement, and no one can pay to change the ranking. Check any license before you sign (how).

InstallerSystemsCSLB license
Sunpower Corporation Systems46#890895 check status
Sunpower10#961988 active
Solar Optimum Design & Electrical3#972228 active
Sunrun3#750184 active
Tesla Energy Operations Inc3#888104 active
Better Earth Electric Inc2#1024460 active
Orange County Contracting Services2#1023627 active
The Energy Co2#1096653 check status
Effect Energy Inc2#1014270 active
Infinity Energy Inc1#998627 check status

Equipment installed in Silverado

The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.

Solar panelsShare of systems
Qcells39%
SunPower27%
Panasonic7%
REC4%
Canadian Solar3%
Inverter or battery systemShare of systems
Enphase53%
SolarEdge24%
SunPower7%
Tesla7%
APsystems3%

Comparing home batteries →

Your utility and solar billing

Solar permits in Silverado

Unincorporated Orange County uses SolarAPP+ for instant home solar permits; if your home is inside a city, that city issues the permit.

State law caps a home solar permit fee at $450 plus $15 per kW above 15 kW (Gov. Code §66015), and requires larger cities to offer instant online permits for home solar and paired batteries up to 38.4 kW (SB 379). Your installer normally pulls the permit. How solar permits work.

SolarAPP+ list checked Oct 1, 2026.

Questions about solar in Silverado

How many homes in Silverado have solar?

183 home solar systems are on record in Silverado since 2001, including 28 connected in 2025.

Do new solar homes in Silverado get batteries?

61% of the home solar systems added in Silverado in 2025 included a battery.

How long does the utility take to approve solar in Silverado?

In 2025, the median time from the interconnection application to permission to operate was 14 days. That's the utility's step only; design and city permits come before it.

Who installs the most solar in Silverado?

By public records, Sunpower Corporation Systems connected the most home solar systems in Silverado in 2023–2025. Rankings here are by count only; no one can pay to change them.

Which utility serves Silverado?

Southern California Edison (SCE): net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.

About this data