In short

Installers in La Crescenta

InstallerSystems (2023–2025)With a batteryLeased or PPAMedian $/WCSLB license
Sunrun4367%86%—#750184 active
Tesla Energy Operations Inc2070%0%—#888104 active
Solar Optimum Design & Electrical19———#972228 active
Sunpower Corporation Systems16———#890895 check status
Orange County Contracting Services12———#1023627 active
ESP Contracting10———#619149 listed as: contr bond susp

Median price per watt: solar-only systems owners bought, shown when at least 20 are priced. License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

How to use this list

About this data