In short
- 65 new home solar systems were connected in Bloomington in 2025, down 26% from 2024 (88).
- 91% of them came with a battery, compared with 4% in 2022, before net billing began on Apr 15, 2023.
- 74% of 2025 systems were leased or on a power purchase agreement (PPA) rather than bought.
Solar installs in Bloomington by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 28 | 26 | 93% | 68% |
| 2025 | 65 | 59 | 91% | 74% |
| 2024 | 88 | 75 | 85% | 62% |
| 2023 | 137 | 15 | 11% | 32% |
| 2022 | 133 | 5 | 4% | 36% |
| 2021 | 50 | 2 | 4% | 48% |
| 2020 | 40 | 1 | 2% | 55% |
| 2019 | 50 | 1 | 2% | 44% |
| 2018 | 71 | 0 | 0% | 59% |
| 2017 | 81 | 0 | 0% | 57% |
| 2016 | 100 | 0 | 0% | 72% |
Net billing (NEM 3.0) began for SCE and SDG&E customers on Apr 15, 2023; most new systems since then include a battery.
What solar costs in Bloomington
Prices owners reported to the utility in 2024–2025, before incentives. The federal tax credit for homeowners ended Dec 31, 2025, so 2026 buyers pay these prices less any local rebate (see what's left).
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 12 | |
| Total price, solar + battery | $42,600 | $32,200 – $70,500 | 37 |
| Solar size | 7.1 kW | 5.3 kW – 9.4 kW | 290 |
| Battery size | 10.0 kWh | 9.7 kWh – 13.5 kWh | 149 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
How much a system here produces
Modeled for the Inland Empire climate, each kilowatt of south-facing panels makes about 1,700 kWh a year, so a median-size 7.1 kW system makes about 12,100 kWh a year. Source: PVWatts (National Laboratory of the Rockies), 20° tilt, 14% losses. Shade, roof direction and panel type change real output.
Who installs solar in Bloomington
Installers ranked by home systems connected in 2023–2025, from public records. This isn't an endorsement, and no one can pay to change the ranking. Check any license before you sign (how).
| Installer | Systems | CSLB license |
|---|---|---|
| Sunrun | 49 | #750184 active |
| Bright Ops | 36 | #1020761 listed as: susp - no qualifier |
| V3 Electric Inc | 22 | #1000573 active |
| Better Earth Electric Inc | 19 | #1024460 active |
| ESP Contracting | 12 | #619149 listed as: contr bond susp |
| Freedom Forever LLC | 11 | #1029644 check status |
| Powur Home Construction | 7 | #1060243 active |
| Titanium Solar LLC | 7 | #1076974 check status |
| Freedom Forever Southern California LLC | 6 | #1124448 check status |
| Titan Solar Power CA Inc | 5 | #1062072 check status |
All installers in Bloomington, with prices and battery share →
Equipment installed in Bloomington
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 24% |
| JA Solar | 14% |
| LONGi | 12% |
| Canadian Solar | 12% |
| Enphase | 6% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 44% |
| SolarEdge | 37% |
| Tesla | 10% |
| SunPower | 4% |
| Delta | 2% |
Your utility and solar billing
- SCE: Net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.
Solar permits in Bloomington
Unincorporated San Bernardino County uses SolarAPP+ for instant home solar permits; if your home is inside a city, that city issues the permit.
State law caps a home solar permit fee at $450 plus $15 per kW above 15 kW (Gov. Code §66015), and requires larger cities to offer instant online permits for home solar and paired batteries up to 38.4 kW (SB 379). Your installer normally pulls the permit. How solar permits work.
SolarAPP+ list checked Oct 1, 2026.
Questions about solar in Bloomington
How many homes in Bloomington have solar?
1,010 home solar systems are on record in Bloomington since 2006, including 65 connected in 2025.
Do new solar homes in Bloomington get batteries?
91% of the home solar systems added in Bloomington in 2025 included a battery.
How long does the utility take to approve solar in Bloomington?
In 2025, the median time from the interconnection application to permission to operate was 22 days. That's the utility's step only; design and city permits come before it.
Who installs the most solar in Bloomington?
By public records, Sunrun connected the most home solar systems in Bloomington in 2023–2025. Rankings here are by count only; no one can pay to change them.
Which utility serves Bloomington?
Southern California Edison (SCE): net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.
About this data
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.