In short

Bright Ops installs by year

YearNew solar systemsWith a batteryBattery shareBatteries added laterLeased or PPA
2026 (through Aug 31)97493996%299%
20253,7043,54796%599%
20243,9412,94275%5190%
20235,2393907%1887%
20225,950601%284%
20211,869151%193%
20201,29291%096%
201979200%096%
201818200%195%
20173800%092%

Where Bright Ops installs

Home systems connected in 2023–2025, by county:

CountySystems
Riverside County3,313
San Bernardino County3,230
San Diego County3,115
Los Angeles County2,978
Orange County1,103
Ventura County119

Cities and communities

System sizes and prices

Bright Ops's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.

FigureMedianMiddle halfSystems
Price per watt, solar only$5.70/W$4.50/W – $6.90/W156
Total price, solar + battery$57,500$44,500 – $75,500253
Solar size6.0 kW4.4 kW – 8.2 kW12,884
Battery size9.7 kWh9.7 kWh – 9.7 kWh6,878

Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).

Equipment Bright Ops installs

The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.

Solar panelsShare of systems
Qcells44%
LONGi27%
JA Solar13%
Canadian Solar9%
CSISolarCo.,Ltd.4%
Inverter or battery systemShare of systems
SolarEdge76%
Enphase16%
Tesla3%
SunPower3%
Growatt<1%

Comparing home batteries →

Contractor license

Business nameBRIGHT OPS
StatusListed as: Susp - No Qualifier
ClassificationsC10
Issued11/14/2016
Expires11/30/2026

See the live CSLB record →

License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

Also filed as: BRIGHT PLANET, BRIGHT OPS.

About this data