In short
- G A F Energy LLC connected 1,148 home solar systems in Southern California in 2025, up 1025% from 2024.
- 91% of its 2025 systems came with a battery.
- 13% were leased or on a power purchase agreement.
- Contractor license #1062345: active (CSLB).
G A F Energy LLC installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 3,371 | 3,258 | 97% | 2 | 40% |
| 2025 | 1,148 | 1,047 | 91% | 5 | 13% |
| 2024 | 102 | 4 | 4% | 1 | 0% |
| 2023 | 61 | 0 | 0% | 0 | 0% |
| 2022 | 18 | 0 | — | 0 | — |
| 2021 | 10 | 0 | — | 0 | — |
| 2020 | 6 | 0 | — | 0 | — |
Where G A F Energy LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 1,171 |
| San Bernardino County | 1,159 |
| Riverside County | 1,001 |
| Los Angeles County | 665 |
| Orange County | 562 |
| Ventura County | 124 |
Cities and communities
- Ontario (440)
- San Diego (439)
- Santa Clarita (429)
- Irvine (346)
- Rialto (314)
- Menifee (310)
- Oceanside (273)
- Hesperia (222)
- San Marcos (186)
- Desert Hot Springs (169)
- Chula Vista (159)
- Perris (143)
- Winchester (121)
- Riverside (91)
- Rancho Cucamonga (85)
- Camarillo (85)
- Hacienda Heights (85)
- Loma Linda (81)
- Rancho Mission Viejo (56)
- Fullerton (55)
- Jurupa Valley (51)
- San Jacinto (46)
- Yorba Linda (42)
- Lakeside (39)
System sizes and prices
G A F Energy LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $7.90/W | $3.70/W – $9.70/W | 120 |
| Total price, solar + battery | $37,000 | $27,000 – $52,000 | 901 |
| Solar size | 3.9 kW | 3.3 kW – 4.5 kW | 1,311 |
| Battery size | 13.5 kWh | 11.5 kWh – 13.5 kWh | 1,051 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment G A F Energy LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 79% |
| GAF | 12% |
| GAFEnergyLLC | 5% |
| LONGi | 2% |
| GAF Energy | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 54% |
| Tesla | 31% |
| Delta | 13% |
| SolarEdge | 1% |
| SunPower | <1% |
Contractor license
| Business name | G A F ENERGY LLC |
| Status | Active |
| Classifications | B| C10| C39| C46 |
| Issued | 01/14/2020 |
| Expires | 01/31/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: GAF Energy, GAF ENERGY LLC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.