In short
- Mars Builder Solutions connected 1,295 home solar systems in Southern California in 2025, up 1406% from 2024.
- 38% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1103958: active (CSLB).
Mars Builder Solutions installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 1,068 | 389 | 36% | 2 | 0% |
| 2025 | 1,295 | 494 | 38% | 0 | 0% |
| 2024 | 86 | 0 | 0% | 1 | 0% |
Where Mars Builder Solutions installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 772 |
| Orange County | 523 |
| Riverside County | 438 |
| San Bernardino County | 388 |
| San Diego County | 186 |
| Ventura County | 142 |
Cities and communities
- Lancaster (560)
- Irvine (424)
- Beaumont (216)
- Temecula (155)
- Redlands (134)
- Ontario (124)
- Fontana (112)
- Camarillo (83)
- Pomona (68)
- San Jacinto (58)
- Piru (56)
- Chula Vista (48)
- Artesia (44)
- San Diego (38)
- Placentia (35)
- El Cajon (30)
- Huntington Beach (29)
- Garden Grove (29)
- Palmdale (27)
- Carlsbad (23)
- Covina (22)
- Castaic (21)
- Vista (19)
- Bonsall (17)
System sizes and prices
Mars Builder Solutions's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.20/W | $3.30/W – $6.30/W | 851 |
| Total price, solar + battery | $12,000 | $12,000 – $21,000 | 491 |
| Solar size | 3.3 kW | 2.9 kW – 3.7 kW | 1,381 |
| Battery size | 5.0 kWh | 5.0 kWh – 5.0 kWh | 494 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Mars Builder Solutions installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Aptos | 33% |
| Qcells | 23% |
| LONGi | 20% |
| Boviet Solar Technology | 6% |
| Axitec | 5% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 100% |
| SunPower | <1% |
Contractor license
| Business name | MARS BUILDER SOLUTIONS |
| Status | Active |
| Classifications | B| C10 |
| Issued | 04/25/2023 |
| Expires | 04/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: MARS BUILDER SOLUTIONS, Solara Home Energy.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.