In short
- 15,096 new home solar systems were connected in Riverside County in 2025, down 15% from 2024 (17,800).
- 74% of them came with a battery, compared with 10% in 2022, before net billing began on Apr 15, 2023.
- Owners who bought their systems paid a median $4.20/W before incentives, about $27,700 for a typical 6.6 kW system.
- 57% of 2025 systems were leased or on a power purchase agreement (PPA) rather than bought.
Cities and communities in Riverside County
Places with at least 150 home solar systems on record, most first.
- Menifee
- Corona
- Murrieta
- Temecula
- Moreno Valley
- Riverside
- Hemet
- Lake Elsinore
- Palm Springs
- Beaumont
- Winchester
- Palm Desert
All 30 places
| Place | Systems on record | New in 2025 | With a battery | Median $/W |
|---|---|---|---|---|
| Menifee | 20,181 | 1,489 | 77% | $4.20/W |
| Corona | 17,957 | 1,121 | 74% | $4.20/W |
| Murrieta | 16,321 | 808 | 94% | $3.50/W |
| Temecula | 14,311 | 886 | 74% | $4.20/W |
| Moreno Valley | 11,284 | 719 | 87% | $4.40/W |
| Riverside | 10,920 | 829 | 89% | $4.00/W |
| Hemet | 10,372 | 883 | 86% | $3.90/W |
| Lake Elsinore | 10,154 | 904 | 69% | $3.10/W |
| Palm Springs | 8,889 | 574 | 83% | $3.40/W |
| Beaumont | 8,863 | 629 | 67% | $4.30/W |
| Winchester | 8,784 | 1,134 | 37% | $4.20/W |
| Palm Desert | 8,407 | 534 | 78% | $3.30/W |
| Perris | 8,135 | 742 | 75% | $4.20/W |
| Cathedral City | 6,404 | 505 | 87% | $3.30/W |
| San Jacinto | 5,678 | 560 | 60% | $3.30/W |
| Rancho Mirage | 5,361 | 249 | 90% | $3.90/W |
| Eastvale | 5,006 | 442 | 74% | $3.70/W |
| Jurupa Valley | 4,666 | 386 | 52% | $3.70/W |
| Desert Hot Springs | 4,507 | 417 | 85% | $2.80/W |
| Wildomar | 4,293 | 330 | 68% | $4.20/W |
| Norco | 2,290 | 120 | 92% | $3.50/W |
| Canyon Lake | 2,078 | 94 | 89% | $3.30/W |
| Indian Wells | 1,853 | 100 | 85% | $3.20/W |
| Calimesa | 1,717 | 68 | 94% | — |
| Blythe | 1,248 | 110 | 94% | $4.80/W |
| Homeland | 1,042 | 221 | 25% | $4.20/W |
| Nuevo | 854 | 80 | 60% | $4.50/W |
| Cherry Valley | 506 | 36 | 89% | — |
| Quail Valley | 448 | 21 | 95% | — |
| Idyllwild | 181 | 17 | — | — |
Solar installs in Riverside County by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 9,450 | 7,449 | 79% | 59% |
| 2025 | 15,096 | 11,242 | 74% | 57% |
| 2024 | 17,800 | 9,996 | 56% | 55% |
| 2023 | 27,040 | 3,791 | 14% | 36% |
| 2022 | 25,615 | 2,478 | 10% | 35% |
| 2021 | 16,895 | 1,514 | 9% | 40% |
| 2020 | 12,516 | 906 | 7% | 47% |
| 2019 | 12,597 | 674 | 5% | 52% |
| 2018 | 11,713 | 430 | 4% | 47% |
| 2017 | 10,596 | 75 | 1% | 50% |
| 2016 | 11,024 | 9 | <1% | 56% |
What solar costs in Riverside County
Prices owners reported in 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.20/W | $3.10/W – $4.50/W | 7,005 |
| Total price, solar + battery | $39,300 | $28,400 – $55,700 | 6,859 |
| Solar size | 6.6 kW | 4.4 kW – 9.8 kW | 59,936 |
| Battery size | 13.5 kWh | 10.0 kWh – 19.4 kWh | 25,005 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Top installers in Riverside County
By home systems connected in 2023–2025. No one can pay to change the ranking.
| Installer | Systems | CSLB license |
|---|---|---|
| Sunrun | 13,578 | #750184 active |
| Sunpower Corporation Systems | 8,310 | #890895 check status |
| Sunnova Energy Corporation | 4,652 | #1003498 check status |
| Bright Ops | 3,121 | #1020761 listed as: susp - no qualifier |
| Renova Energy Corp | 2,088 | #910836 check status |
| Freedom Forever LLC | 1,830 | #1029644 check status |
| Tesla Energy Operations Inc | 1,752 | #888104 active |
| Current Home Solar | 1,085 | #1045016 active |
| ESP Contracting | 920 | #619149 listed as: contr bond susp |
| Exo Energy Inc | 731 | #1063308 active |
All installers in Riverside County →
Utilities in Riverside County
- SCE: Net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.
- RPU: Self-generation: every export credited at avoided cost.
- IID: Net billing: exports paid 6.98¢ per kWh.
- Banning: Buy-back: all exports credited at a wholesale rate.
- MVU: Net metering; no payment for year-end surplus.
Compare the utilities' solar rules →
Questions about solar in Riverside County
How many homes in Riverside County have solar?
203,423 home solar systems are on record in Riverside County since 1999, including 15,096 connected in 2025.
Do new solar homes in Riverside County get batteries?
74% of the home solar systems added in Riverside County in 2025 included a battery.
How much does solar cost in Riverside County?
Owners who bought solar in Riverside County in 2024–2025 paid a median $4.20/W before incentives, about $27,700 for a typical 6.6 kW system. Solar with a battery cost a median $39,300 in total.
How long does the utility take to approve solar in Riverside County?
In 2025, the median time from the interconnection application to permission to operate was 29 days. That's the utility's step only; design and city permits come before it.
Who installs the most solar in Riverside County?
By public records, Sunrun connected the most home solar systems in Riverside County in 2023–2025. Rankings here are by count only; no one can pay to change them.
About this data
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.