In short
- Jamar Power Systems connected 48 home solar systems in Southern California in 2025, down 41% from 2024.
- 29% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #827648: active (CSLB).
Jamar Power Systems installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 57 | 12 | 21% | 3 | 2% |
| 2025 | 48 | 14 | 29% | 6 | 0% |
| 2024 | 81 | 8 | 10% | 2 | 0% |
| 2023 | 132 | 3 | 2% | 2 | 0% |
| 2022 | 63 | 3 | 5% | 11 | 2% |
| 2021 | 45 | 1 | 2% | 2 | 0% |
| 2020 | 19 | 4 | — | 0 | — |
| 2019 | 45 | 0 | 0% | 0 | 0% |
| 2018 | 28 | 0 | 0% | 0 | 0% |
| 2017 | 32 | 0 | 0% | 0 | 12% |
| 2016 | 38 | 0 | 0% | 0 | 16% |
Where Jamar Power Systems installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 317 |
| Orange County | 1 |
Cities and communities
- La Mesa (53)
- San Diego (49)
- El Cajon (47)
- Oceanside (36)
- Escondido (21)
- Chula Vista (18)
- Encinitas (16)
- Carlsbad (14)
- Santee (14)
- Vista (14)
- Lemon Grove (6)
- Solana Beach (5)
- Del Mar (3)
- Jamul (3)
- Poway (3)
- San Marcos (2)
- Alpine (2)
- Lakeside (2)
- Rancho Santa Fe (2)
- San Juan Capistrano (1)
- Imperial Beach (1)
- Spring Valley (1)
- National City (1)
- Descanso (1)
System sizes and prices
Jamar Power Systems's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.90/W | $3.50/W – $4.10/W | 106 |
| Total price, solar + battery | $58,650 | $55,150 – $67,975 | 22 |
| Solar size | 2.9 kW | 2.2 kW – 5.0 kW | 261 |
| Battery size | 7.7 kWh | 7.4 kWh – 7.7 kWh | 25 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Jamar Power Systems installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| UnitedRenewableEnergyCo.,Ltd. | 52% |
| Qcells | 15% |
| LG | 14% |
| Silfab | 10% |
| PhonoSolarTechnologyCo.,Ltd. | 6% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 98% |
| NeoVoltaInc. | <1% |
| Sol-Ark | <1% |
| ABB | <1% |
| SchneiderElectricUSA,Inc. | <1% |
Contractor license
| Business name | JAMAR POWER SYSTEMS |
| Status | Active |
| Classifications | C10 |
| Issued | 11/20/2003 |
| Expires | 11/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Jamar Power Systems, JAMAR POWER SYSTEMS.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.