In short
- Shelter Roofing & Solar Construction connected 104 home solar systems in Southern California in 2025, up 89% from 2024.
- 95% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #624196: active (CSLB).
Shelter Roofing & Solar Construction installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 47 | 45 | 96% | 17% |
| 2025 | 104 | 99 | 95% | 0% |
| 2024 | 55 | 46 | 84% | 0% |
| 2023 | 92 | 18 | 20% | 0% |
| 2022 | 90 | 27 | 30% | 0% |
| 2021 | 54 | 16 | 30% | 0% |
| 2020 | 34 | 4 | 12% | 0% |
| 2019 | 13 | 3 | — | — |
| 2017 | 5 | 0 | — | — |
| 2016 | 10 | 0 | — | — |
Where Shelter Roofing & Solar Construction installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Ventura County | 231 |
| Los Angeles County | 67 |
Cities and communities
- Thousand Oaks (81)
- Moorpark (47)
- Simi Valley (31)
- Westlake Village (26)
- Camarillo (24)
- Ventura (15)
- Calabasas (15)
- Agoura Hills (15)
- Oak Park (8)
- Santa Rosa Valley (7)
- Ojai (5)
- Santa Clarita (5)
- Oxnard (4)
- Somis (3)
- Port Hueneme (3)
- Malibu (2)
- Bell Canyon (1)
- La Crescenta (1)
- Santa Paula (1)
- Stevenson Ranch (1)
- Manhattan Beach (1)
System sizes and prices
Shelter Roofing & Solar Construction's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 13 | |
| Total price, solar + battery | $48,700 | $34,475 – $63,650 | 144 |
| Solar size | 8.1 kW | 6.1 kW – 10.4 kW | 251 |
| Battery size | 15.0 kWh | 10.1 kWh – 15.0 kWh | 163 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Shelter Roofing & Solar Construction installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Silfab | 58% |
| REC | 23% |
| Enphase | 4% |
| SunPower | 3% |
| Solaria | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 69% |
| SolarEdge | 16% |
| Tesla | 7% |
| SunPower | 3% |
| SMA | 2% |
Contractor license
| Business name | SHELTER ROOFING & SOLAR CONSTRUCTION |
| Status | Active |
| Classifications | C10| C39 |
| Issued | 08/02/1991 |
| Expires | 06/30/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: SHELTER ROOFING & SOLAR CONSTRUCTION, Shelter Roof Systems.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.