In short

Installers in Garden Grove

InstallerSystems (2023–2025)With a batteryLeased or PPAMedian $/WCSLB license
Swss Electrical21321%32%$3.40/W#1004667 active
Sunrun21269%77%$4.50/W#750184 active
Ecosolar USA Electrical LLC1444%3%$4.30/W#1045300 active
US Builder Group Inc1030%0%$3.50/W#1051487 check status
Bright Ops9764%95%—#1020761 listed as: susp - no qualifier
Tesla Energy Operations Inc8962%0%$2.80/W#888104 active
Freedom Forever LLC6529%55%$4.90/W#1029644 check status
Sunpower Corporation Systems378%14%$4.50/W#890895 check status
ESP Contracting2850%46%—#619149 listed as: contr bond susp
Orange County Contracting Services2544%0%—#1023627 active
Powur Home Construction2412%0%$5.00/W#1060243 active
Exo Energy Inc239%100%—#1063308 active
H L V Electric Co19———#910748 active
Better Earth Electric Inc18———#1024460 active
Titanium Solar LLC18———#1076974 check status
Solar Optimum Design & Electrical18———#972228 active
Essential Design Innovator Inc15———#1042417 active
Freedom Forever14———#1124448 check status
Infinity Solar13———#824287 active
Solarmax Renewable Energy Provider Inc12———#972048 active
Semper Solaris10———#978152 active

Median price per watt: solar-only systems owners bought, shown when at least 20 are priced. License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

How to use this list

About this data