In short
- Ecosolar USA Electrical LLC connected 127 home solar systems in Southern California in 2025, up 26% from 2024.
- 19% of its 2025 systems came with a battery.
- 4% were leased or on a power purchase agreement.
- Contractor license #1045300: active (CSLB).
Ecosolar USA Electrical LLC installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 77 | 15 | 19% | 1% |
| 2025 | 127 | 24 | 19% | 4% |
| 2024 | 101 | 13 | 13% | 5% |
| 2023 | 176 | 3 | 2% | 2% |
| 2022 | 89 | 6 | 7% | 8% |
| 2021 | 70 | 1 | 1% | 4% |
| 2020 | 69 | 2 | 3% | 3% |
| 2019 | 39 | 1 | 3% | 5% |
Where Ecosolar USA Electrical LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Orange County | 416 |
| Los Angeles County | 46 |
| Riverside County | 12 |
| San Bernardino County | 7 |
Cities and communities
- Garden Grove (171)
- Westminster (77)
- Fountain Valley (41)
- Huntington Beach (32)
- Santa Ana (32)
- Orange (10)
- Long Beach (9)
- Stanton (9)
- Irvine (8)
- Corona (7)
- Buena Park (7)
- Anaheim (7)
- Midway City (5)
- San Gabriel (5)
- Tustin (3)
- Torrance (3)
- Rosemead (3)
- Arcadia (3)
- Lakewood (2)
- Gardena (2)
- Rowland Heights (2)
- Moreno Valley (2)
- Yorba Linda (2)
- Diamond Bar (2)
System sizes and prices
Ecosolar USA Electrical LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.40/W | $3.90/W – $4.90/W | 181 |
| Total price, solar + battery | $46,000 | $41,600 – $54,950 | 27 |
| Solar size | 3.3 kW | 2.3 kW – 8.0 kW | 404 |
| Battery size | 13.5 kWh | 13.5 kWh – 13.5 kWh | 40 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Ecosolar USA Electrical LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| SunPower | 36% |
| Qcells | 19% |
| Silfab | 16% |
| Hyundai | 11% |
| Maxeon | 5% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 62% |
| SolarEdge | 15% |
| SunPower | 12% |
| Tesla | 7% |
| APsystems | 1% |
Contractor license
| Business name | ECOSOLAR USA ELECTRICAL LLC |
| Status | Active |
| Classifications | C10| C46 |
| Issued | 10/08/2018 |
| Expires | 10/31/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: EcosolarUSA, Ecosolar USA.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.