In short
- Action Solar connected 244 home solar systems in Southern California in 2025, up 1062% from 2024.
- 99% of its 2025 systems came with a battery.
- 93% were leased or on a power purchase agreement.
- Contractor license #1089987: active (CSLB).
Action Solar installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 113 | 113 | 100% | 90% |
| 2025 | 244 | 241 | 99% | 93% |
| 2024 | 21 | 19 | 90% | 67% |
| 2023 | 1 | 0 | — | — |
Where Action Solar installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Ventura County | 149 |
| San Bernardino County | 81 |
| Los Angeles County | 65 |
| Riverside County | 51 |
| Orange County | 17 |
| San Diego County | 16 |
Cities and communities
- Oxnard (68)
- Ventura (31)
- Camarillo (28)
- Lancaster (21)
- Palmdale (19)
- Thousand Oaks (14)
- Ontario (11)
- Apple Valley (10)
- Moreno Valley (8)
- Hesperia (7)
- San Bernardino (7)
- Victorville (7)
- Barstow (7)
- Port Hueneme (6)
- Blythe (6)
- Yorba Linda (5)
- Murrieta (5)
- Lake Elsinore (5)
- Rancho Mirage (4)
- Santa Clarita (4)
- Perris (4)
- Phelan (4)
- Fontana (4)
- Chino (4)
System sizes and prices
Action Solar's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 4 | |
| Total price, solar + battery | $51,800 | $39,900 – $75,500 | 21 |
| Solar size | 6.9 kW | 5.0 kW – 8.9 kW | 266 |
| Battery size | 9.7 kWh | 5.0 kWh – 10.0 kWh | 260 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Action Solar installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Jinko Solar | 44% |
| Qcells | 35% |
| Enphase | 9% |
| Canadian Solar | 4% |
| JA Solar | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 56% |
| SolarEdge | 33% |
| Tesla | 8% |
| Northern Electric | 2% |
| GoodWe Technologies | <1% |
Contractor license
| Business name | ACTION SOLAR |
| Status | Active |
| Classifications | C10 |
| Issued | 04/13/2022 |
| Expires | 04/30/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Porticade Construction DBA Action Solar, ACTION SOLAR.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.