In short
- Advanced Improvements Inc connected 10 home solar systems in Southern California in 2025.
- Contractor license #947761: active (CSLB).
Advanced Improvements Inc installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 11 | 1 | — | — |
| 2025 | 10 | 0 | — | — |
| 2024 | 18 | 1 | — | — |
| 2023 | 42 | 2 | 5% | 0% |
| 2022 | 18 | 0 | — | — |
| 2021 | 20 | 1 | 5% | 0% |
| 2020 | 30 | 0 | 0% | 0% |
| 2019 | 26 | 0 | 0% | 0% |
| 2018 | 29 | 0 | 0% | 0% |
| 2017 | 77 | 0 | 0% | 0% |
| 2016 | 80 | 0 | 0% | 0% |
Where Advanced Improvements Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Orange County | 46 |
| Los Angeles County | 14 |
| San Bernardino County | 8 |
| Riverside County | 7 |
| San Diego County | 6 |
Cities and communities
- Yorba Linda (5)
- Lake Forest (5)
- San Marcos (5)
- Seal Beach (4)
- Corona (3)
- Fullerton (3)
- Long Beach (3)
- Irvine (3)
- Laguna Niguel (3)
- San Clemente (3)
- San Bernardino (2)
- Santa Ana (2)
- Placentia (2)
- Huntington Beach (2)
- Ontario (2)
- Orange (2)
- Villa Park (2)
- Tustin (2)
- Rancho Cucamonga (2)
- Arcadia (2)
- Norco (2)
- Garden Grove (1)
- Cerritos (1)
- Westminster (1)
System sizes and prices
Advanced Improvements Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $2.80/W | $2.70/W – $2.80/W | 27 |
| Total price, solar + battery | too few to say | 1 | |
| Solar size | 7.2 kW | 5.2 kW – 10.8 kW | 70 |
| Battery size | too few to say | 3 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Advanced Improvements Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| United Renewable Energy | 70% |
| Qcells | 11% |
| Znshine PV-Tech | 7% |
| UnitedRenewableEnergyCo.,Ltd. | 6% |
| Enphase | 3% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 61% |
| SolarEdge | 27% |
| SunPower | 6% |
| ABB | 3% |
| Tesla | 1% |
Contractor license
| Business name | ADVANCED IMPROVEMENTS INC |
| Status | Active |
| Classifications | B| C10| C20| C36| C39 |
| Issued | 05/26/2010 |
| Expires | 05/31/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Advanced Improvements Inc, Advanced Improvements.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.