In short
- Bryton Power LLC connected 319 home solar systems in Southern California in 2025, up 71% from 2024.
- 97% of its 2025 systems came with a battery.
- 82% were leased or on a power purchase agreement.
- Contractor license #826729: check its status with CSLB.
Bryton Power LLC installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 18 | 17 | — | — |
| 2025 | 319 | 310 | 97% | 82% |
| 2024 | 187 | 162 | 87% | 42% |
| 2023 | 15 | 0 | — | — |
Where Bryton Power LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 342 |
| Riverside County | 144 |
| Los Angeles County | 33 |
| Orange County | 18 |
| San Diego County | 2 |
Cities and communities
- Fontana (58)
- San Bernardino (57)
- Ontario (46)
- Hesperia (33)
- Cathedral City (29)
- Victorville (27)
- Rialto (26)
- Moreno Valley (24)
- Desert Hot Springs (15)
- Twentynine Palms (13)
- Riverside (12)
- Yucca Valley (12)
- Apple Valley (10)
- Santa Ana (10)
- Corona (10)
- Highland (9)
- Lake Elsinore (8)
- Perris (8)
- Pomona (7)
- Chino (7)
- Santa Clarita (6)
- Jurupa Valley (6)
- Redlands (6)
- Yucaipa (6)
System sizes and prices
Bryton Power LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 16 | |
| Total price, solar + battery | $27,900 | $21,300 – $36,400 | 145 |
| Solar size | 6.3 kW | 4.7 kW – 8.2 kW | 521 |
| Battery size | 5.0 kWh | 5.0 kWh – 5.0 kWh | 472 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Bryton Power LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 44% |
| Qcells | 35% |
| Enphase | 8% |
| SunPower | 3% |
| Vietnam Sunergy | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 96% |
| SolarEdge | 3% |
| SunPower | 1% |
| ABB | <1% |
| Tesla | <1% |
Contractor license
License #826729 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: BRYTON, Eric , Miller.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.