In short
- Burtek Energy LLC connected 15 home solar systems in Southern California in 2025.
- Contractor license #1019515: active (CSLB).
Burtek Energy LLC installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 3 | 3 | — | 4 | — |
| 2025 | 15 | 12 | — | 5 | — |
| 2024 | 10 | 6 | — | 6 | — |
| 2023 | 36 | 4 | 11% | 16 | 6% |
| 2022 | 13 | 2 | — | 17 | — |
| 2021 | 4 | 0 | — | 28 | — |
| 2020 | 7 | 0 | — | 2 | — |
| 2019 | 31 | 1 | 3% | 0 | 29% |
| 2018 | 59 | 0 | 0% | 0 | 49% |
| 2017 | 116 | 0 | 0% | 0 | 41% |
| 2016 | 12 | 0 | — | 0 | — |
Where Burtek Energy LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 60 |
| Riverside County | 3 |
| Orange County | 1 |
Cities and communities
- San Diego (33)
- Oceanside (4)
- Escondido (4)
- Encinitas (4)
- Valley Center (2)
- San Marcos (2)
- La Mesa (2)
- Winchester (1)
- Lake Forest (1)
- Menifee (1)
- Temecula (1)
- Ramona (1)
- Vista (1)
- Bonsall (1)
- Coronado (1)
- El Cajon (1)
- Poway (1)
- Jamul (1)
- Chula Vista (1)
- Pine Valley (1)
System sizes and prices
Burtek Energy LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 6 | |
| Total price, solar + battery | too few to say | 15 | |
| Solar size | 6.1 kW | 4.6 kW – 7.5 kW | 61 |
| Battery size | 11.5 kWh | 7.7 kWh – 23.0 kWh | 22 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Burtek Energy LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Panasonic | 34% |
| SunPower | 33% |
| Maxeon | 13% |
| WAAREEENERGIESLIMITED | 7% |
| Hyundai | 5% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 61% |
| SunPower | 21% |
| Tesla | 15% |
| Growatt | 2% |
| NeoVoltaInc. | 2% |
Contractor license
| Business name | BURTEK ENERGY LLC |
| Status | Active |
| Classifications | A| B| C10| C20| C46 |
| Issued | 10/19/2016 |
| Expires | 10/31/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Burmax Energy, BURTEK ENERGY LLC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.