In short
- Carlsbad Construction connected 12 home solar systems in Southern California in 2025, down 40% from 2024.
- Contractor license #1023872: active (CSLB).
Carlsbad Construction installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 7 | 2 | — | 4 | — |
| 2025 | 12 | 8 | — | 1 | — |
| 2024 | 20 | 10 | 50% | 4 | 0% |
| 2023 | 60 | 4 | 7% | 1 | 0% |
| 2022 | 84 | 9 | 11% | 0 | 0% |
| 2021 | 57 | 2 | 4% | 0 | 0% |
| 2020 | 39 | 0 | 0% | 0 | 0% |
| 2019 | 65 | 0 | 0% | 0 | 0% |
| 2018 | 2 | 0 | — | 0 | — |
| 2017 | 1 | 0 | — | 0 | — |
Where Carlsbad Construction installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 97 |
| Riverside County | 1 |
| Orange County | 1 |
Cities and communities
- Carlsbad (32)
- Oceanside (17)
- Encinitas (12)
- San Diego (9)
- Vista (9)
- Escondido (5)
- Rancho Santa Fe (3)
- San Marcos (2)
- Solana Beach (2)
- Temecula (1)
- Poway (1)
- Bonita (1)
- Del Mar (1)
- San Clemente (1)
- Descanso (1)
- Imperial Beach (1)
- Bonsall (1)
System sizes and prices
Carlsbad Construction's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 14 | |
| Total price, solar + battery | too few to say | 18 | |
| Solar size | 7.8 kW | 6.5 kW – 9.1 kW | 92 |
| Battery size | 8.1 kWh | 7.7 kWh – 11.5 kWh | 22 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Carlsbad Construction installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| SolariaCorporation | 53% |
| Qcells | 24% |
| Axitec | 9% |
| CSISolarCo.,Ltd. | 5% |
| AptosSolarTechnologyLLC | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| SolarEdge | 63% |
| Enphase | 18% |
| Tesla | 7% |
| PointGuard | 7% |
| NeoVoltaInc. | 3% |
Contractor license
| Business name | CARLSBAD CONSTRUCTION |
| Status | Active |
| Classifications | B| C10 |
| Issued | 02/21/2017 |
| Expires | 02/28/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: CARLSBAD SOLAR CORPORATION, CARLSBAD SOLAR CORPORATION DBA CARLSBAD CONSTRUCTION.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.