In short
- Electricare Inc connected 11 home solar systems in Southern California in 2025.
- Contractor license #778366: active (CSLB).
Electricare Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 5 | 3 | — | 0 | — |
| 2025 | 11 | 9 | — | 1 | — |
| 2024 | 16 | 4 | — | 0 | — |
| 2023 | 82 | 15 | 18% | 0 | 0% |
| 2022 | 76 | 15 | 20% | 0 | 0% |
| 2021 | 61 | 8 | 13% | 0 | 0% |
| 2020 | 43 | 1 | 2% | 0 | 0% |
| 2019 | 35 | 0 | 0% | 0 | 0% |
| 2018 | 27 | 0 | 0% | 0 | 4% |
| 2017 | 21 | 0 | 0% | 0 | 0% |
| 2016 | 44 | 0 | 0% | 0 | 11% |
Where Electricare Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Riverside County | 55 |
| San Bernardino County | 29 |
| Orange County | 18 |
| Los Angeles County | 5 |
| San Diego County | 5 |
| Ventura County | 2 |
Cities and communities
- Corona (7)
- Murrieta (5)
- Fontana (5)
- Ontario (5)
- Menifee (5)
- Redlands (4)
- Palm Springs (4)
- Huntington Beach (4)
- Rancho Mirage (4)
- Temecula (4)
- Chino (4)
- Hemet (4)
- Beaumont (3)
- Chino Hills (3)
- San Bernardino (3)
- Lake Forest (3)
- Palm Desert (2)
- Irvine (2)
- Wildomar (2)
- Rancho Cucamonga (2)
- Moreno Valley (2)
- Indian Wells (2)
- Mission Viejo (2)
- Cathedral City (2)
System sizes and prices
Electricare Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 14 | |
| Total price, solar + battery | too few to say | 11 | |
| Solar size | 7.5 kW | 5.6 kW – 9.8 kW | 109 |
| Battery size | 14.4 kWh | 12.6 kWh – 15.9 kWh | 28 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Electricare Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Solaria | 45% |
| Qcells | 22% |
| REC | 21% |
| SunPower | 3% |
| Maxeon | 3% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 57% |
| SolarEdge | 27% |
| Tesla | 7% |
| SunPower | 5% |
| Delta | 2% |
Contractor license
| Business name | ELECTRICARE INC |
| Status | Active |
| Classifications | C10 |
| Issued | 05/05/2000 |
| Expires | 03/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Electricare, Inc., ELECTRICARE.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.