In short

GR8 Energy installs by year

YearNew solar systemsWith a batteryBattery shareBatteries added laterLeased or PPA
2026 (through Aug 31)00—2—
202544—0—
2024119—1—
20234524%44%
202251510%30%
20217511%20%
20207756%010%
20197334%00%
20186312%00%
20178900%00%
20165500%00%

Where GR8 Energy installs

Home systems connected in 2023–2025, by county:

CountySystems
San Diego County37
Orange County14
Riverside County4
San Bernardino County3
Los Angeles County2

Cities and communities

System sizes and prices

GR8 Energy's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.

FigureMedianMiddle halfSystems
Price per watt, solar onlytoo few to say2
Total price, solar + batterytoo few to say13
Solar size6.8 kW5.5 kW – 9.4 kW60
Battery sizetoo few to say15

Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).

Equipment GR8 Energy installs

The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.

Solar panelsShare of systems
REC38%
Qcells33%
Hyundai13%
CSISolarCo.,Ltd.3%
Silfab2%
Inverter or battery systemShare of systems
Enphase83%
SolarEdge13%
SunPower2%
Tesla2%

Comparing home batteries →

Contractor license

Business nameGR8 ENERGY
StatusActive
ClassificationsC46
Issued10/16/2014
Expires10/31/2028

See the live CSLB record →

License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

Also filed as: GR8 Energy, THE GREEN STORE INC.

About this data