In short
- Green Conception Inc connected 28 home solar systems in Southern California in 2025, down 26% from 2024.
- 96% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #964965: active (CSLB).
Green Conception Inc installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 24 | 24 | 100% | 0% |
| 2025 | 28 | 27 | 96% | 0% |
| 2024 | 38 | 26 | 68% | 0% |
| 2023 | 63 | 0 | 0% | 0% |
| 2022 | 36 | 0 | 0% | 0% |
| 2021 | 28 | 0 | 0% | 0% |
| 2020 | 20 | 0 | 0% | 0% |
| 2019 | 21 | 0 | 0% | 0% |
| 2018 | 38 | 1 | 3% | 0% |
| 2017 | 29 | 1 | 3% | 0% |
| 2016 | 26 | 0 | 0% | 0% |
Where Green Conception Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 84 |
| Ventura County | 22 |
| San Bernardino County | 17 |
| Orange County | 11 |
| Riverside County | 11 |
| San Diego County | 8 |
Cities and communities
- Santa Clarita (15)
- Long Beach (10)
- Thousand Oaks (6)
- Torrance (6)
- Joshua Tree (6)
- San Diego (6)
- Camarillo (5)
- Arcadia (4)
- Malibu (3)
- Simi Valley (3)
- Sierra Madre (3)
- Culver City (3)
- La Canada Flintridge (3)
- Moorpark (2)
- Walnut (2)
- Monterey Park (2)
- Norwalk (2)
- Pasadena (2)
- Santa Monica (2)
- Oak Park (2)
- West Covina (2)
- Cerritos (2)
- Castaic (2)
- Redondo Beach (2)
System sizes and prices
Green Conception Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 13 | |
| Total price, solar + battery | $34,200 | $26,800 – $48,500 | 53 |
| Solar size | 7.2 kW | 5.6 kW – 9.7 kW | 129 |
| Battery size | 10.5 kWh | 10.0 kWh – 13.5 kWh | 53 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Green Conception Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Silfab | 39% |
| Qcells | 27% |
| REC | 17% |
| Enphase | 9% |
| JA Solar | 5% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 59% |
| SolarEdge | 16% |
| Tesla | 14% |
| SunPower | 5% |
| Growatt | 2% |
Contractor license
| Business name | GREEN CONCEPTION INC |
| Status | Active |
| Classifications | B |
| Issued | 08/26/2011 |
| Expires | 08/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Green Conception, GreenConception.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.