In short
- Green Road Solar connected 42 home solar systems in Southern California in 2025, up 62% from 2024.
- 71% of its 2025 systems came with a battery.
- 26% were leased or on a power purchase agreement.
- Contractor license #978687: active (CSLB).
Green Road Solar installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 14 | 10 | — | — |
| 2025 | 42 | 30 | 71% | 26% |
| 2024 | 26 | 13 | 50% | 19% |
| 2023 | 82 | 17 | 21% | 2% |
| 2022 | 78 | 9 | 12% | 6% |
| 2021 | 73 | 5 | 7% | 7% |
| 2020 | 56 | 5 | 9% | 9% |
| 2019 | 54 | 3 | 6% | 2% |
| 2018 | 28 | 0 | 0% | 18% |
| 2017 | 20 | 0 | 0% | 0% |
| 2016 | 29 | 0 | 0% | 83% |
Where Green Road Solar installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 86 |
| Orange County | 29 |
| Ventura County | 19 |
| Riverside County | 14 |
| San Bernardino County | 12 |
| San Diego County | 4 |
Cities and communities
- Santa Clarita (14)
- Monrovia (13)
- La Crescenta (7)
- Thousand Oaks (7)
- Palmdale (6)
- Simi Valley (5)
- Irvine (4)
- Pasadena (4)
- La Canada Flintridge (4)
- Altadena (4)
- Murrieta (3)
- Corona (3)
- Orange (3)
- Santa Ana (3)
- Lakewood (3)
- Cathedral City (3)
- Oxnard (3)
- Downey (3)
- Desert Hot Springs (3)
- Lancaster (3)
- Montclair (2)
- Garden Grove (2)
- La Habra (2)
- Lake Forest (2)
System sizes and prices
Green Road Solar's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $7.70/W | $3.50/W – $9.60/W | 22 |
| Total price, solar + battery | $58,400 | $35,150 – $92,200 | 27 |
| Solar size | 8.0 kW | 6.0 kW – 12.5 kW | 150 |
| Battery size | 13.5 kWh | 13.5 kWh – 27.0 kWh | 60 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Green Road Solar installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 70% |
| SolarJuice Technology | 13% |
| Hyundai | 7% |
| Tesla | 3% |
| Solaria | 3% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 54% |
| SolarEdge | 19% |
| Tesla | 19% |
| SunPower | 5% |
| Growatt | 3% |
Contractor license
| Business name | GREEN ROAD SOLAR |
| Status | Active |
| Classifications | B| C10 |
| Issued | 11/14/2012 |
| Expires | 11/30/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: LA Power Center Corporation, GREEN ROAD SOLAR.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.