In short
- Grid Alternatives connected 159 home solar systems in Southern California in 2025, down 39% from 2024.
- 58% of its 2025 systems came with a battery.
- 90% were leased or on a power purchase agreement.
- Contractor license #867533: active (CSLB).
Grid Alternatives installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 142 | 87 | 61% | 20 | 91% |
| 2025 | 159 | 92 | 58% | 28 | 90% |
| 2024 | 259 | 3 | 1% | 3 | 87% |
| 2023 | 248 | 0 | 0% | 0 | 92% |
| 2022 | 295 | 0 | 0% | 0 | 93% |
| 2021 | 262 | 0 | 0% | 0 | 94% |
| 2020 | 265 | 0 | 0% | 0 | 86% |
| 2019 | 307 | 0 | 0% | 0 | 83% |
| 2018 | 341 | 0 | 0% | 0 | 89% |
| 2017 | 353 | 0 | 0% | 0 | 85% |
| 2016 | 278 | 0 | 0% | 0 | 66% |
Where Grid Alternatives installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 319 |
| Los Angeles County | 222 |
| Riverside County | 145 |
| San Diego County | 99 |
| Orange County | 22 |
| Ventura County | 1 |
Cities and communities
- Ontario (121)
- Moreno Valley (59)
- San Bernardino (57)
- San Diego (29)
- Palmdale (28)
- Fontana (26)
- Compton (24)
- Long Beach (22)
- Rialto (21)
- Perris (21)
- Pomona (21)
- Barstow (18)
- Riverside (17)
- Los Angeles (17)
- Victorville (14)
- Chula Vista (14)
- La Puente (13)
- Montclair (13)
- Palm Desert (13)
- Campo (11)
- Norwalk (10)
- El Cajon (10)
- National City (10)
- Blythe (9)
System sizes and prices
Grid Alternatives's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $5.00/W | $4.60/W – $5.30/W | 24 |
| Total price, solar + battery | too few to say | 14 | |
| Solar size | 4.9 kW | 4.0 kW – 5.4 kW | 666 |
| Battery size | 13.5 kWh | 13.5 kWh – 13.5 kWh | 95 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Grid Alternatives installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| JA Solar | 26% |
| Canadian Solar | 26% |
| LONGi | 21% |
| Trina Solar | 15% |
| CSISolarCo.,Ltd. | 3% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 68% |
| SolarEdge | 15% |
| Tesla | 13% |
| SunPower | 1% |
| ABB | 1% |
Contractor license
| Business name | GRID ALTERNATIVES |
| Status | Active |
| Classifications | B| C10| C46 |
| Issued | 11/14/2005 |
| Expires | 11/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: GRID ALTERNATIVES, GRID Alternatives.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.