In short
- Haven Energy Services Inc connected 76 home solar systems in Southern California in 2025, up 204% from 2024.
- 100% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1104018: active (CSLB).
Haven Energy Services Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 200 | 200 | 100% | 67 | 32% |
| 2025 | 76 | 76 | 100% | 4 | 0% |
| 2024 | 25 | 25 | 100% | 0 | 0% |
Where Haven Energy Services Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 115 |
| Riverside County | 74 |
| San Bernardino County | 54 |
| Ventura County | 28 |
| Orange County | 22 |
| San Diego County | 8 |
Cities and communities
- Santa Clarita (17)
- Menifee (13)
- Victorville (11)
- Monrovia (8)
- Thousand Oaks (8)
- San Bernardino (7)
- Winchester (7)
- Irvine (7)
- La Puente (7)
- Moreno Valley (6)
- Lake Elsinore (6)
- Fontana (6)
- Wildomar (5)
- Perris (5)
- Hemet (5)
- Lancaster (5)
- Rowland Heights (5)
- Downey (4)
- Chino (4)
- Pomona (4)
- Santa Rosa Valley (4)
- Corona (4)
- Temple City (4)
- Beaumont (4)
System sizes and prices
Haven Energy Services Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | not reported | ||
| Total price, solar + battery | $29,000 | $21,625 – $30,550 | 94 |
| Solar size | 5.8 kW | 4.5 kW – 8.1 kW | 101 |
| Battery size | 15.0 kWh | 13.5 kWh – 27.0 kWh | 101 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Haven Energy Services Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 11% |
| SunPower | 11% |
| Canadian Solar | 10% |
| FranklinWH | 10% |
| Tesla | 10% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 35% |
| SolarEdge | 23% |
| SunPower | 9% |
| ABB | 8% |
| SMA | 6% |
Contractor license
| Business name | HAVEN ENERGY SERVICES INC |
| Status | Active |
| Classifications | B| C10 |
| Issued | 04/27/2023 |
| Expires | 04/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Haven Energy.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.