In short
- Hot Purple Energy connected 179 home solar systems in Southern California in 2025, up 34% from 2024.
- 94% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #940550: active (CSLB).
Hot Purple Energy installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 110 | 103 | 94% | 0% |
| 2025 | 179 | 169 | 94% | 0% |
| 2024 | 134 | 118 | 88% | 0% |
| 2023 | 218 | 131 | 60% | 0% |
| 2022 | 311 | 224 | 72% | <1% |
| 2021 | 213 | 112 | 53% | 0% |
| 2020 | 197 | 129 | 65% | 0% |
| 2019 | 215 | 86 | 40% | 0% |
| 2018 | 171 | 5 | 3% | 16% |
| 2017 | 194 | 0 | 0% | 15% |
| 2016 | 152 | 1 | 1% | 17% |
Where Hot Purple Energy installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Riverside County | 610 |
| San Bernardino County | 29 |
| Orange County | 2 |
Cities and communities
- Palm Springs (376)
- Rancho Mirage (107)
- Palm Desert (49)
- Cathedral City (36)
- Indian Wells (32)
- Yucca Valley (9)
- Morongo Valley (7)
- Joshua Tree (6)
- Desert Hot Springs (6)
- Twentynine Palms (4)
- Beaumont (1)
- Newport Beach (1)
- Dana Point (1)
System sizes and prices
Hot Purple Energy's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $2.50/W | $2.40/W – $3.30/W | 24 |
| Total price, solar + battery | $57,800 | $37,500 – $84,500 | 277 |
| Solar size | 10.2 kW | 7.5 kW – 14.9 kW | 531 |
| Battery size | 27.0 kWh | 13.5 kWh – 27.0 kWh | 416 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Hot Purple Energy installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Panasonic | 52% |
| REC | 22% |
| Tesla | 10% |
| SunPower | 9% |
| LG | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Tesla | 30% |
| Enphase | 26% |
| SolarEdge | 23% |
| SunPower | 8% |
| SMA | 3% |
Contractor license
| Business name | HOT PURPLE ENERGY |
| Status | Active |
| Classifications | B| C46 |
| Issued | 12/01/2009 |
| Expires | 12/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: HOT PURPLE ENERGY, HOT PURPLE INC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.