In short
- Hpm Solar Inc connected 52 home solar systems in Southern California in 2025, about the same as 2024.
- 96% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1048126: active (CSLB).
Hpm Solar Inc installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 48 | 45 | 94% | 33% |
| 2025 | 52 | 50 | 96% | 0% |
| 2024 | 51 | 38 | 75% | 0% |
| 2023 | 101 | 4 | 4% | 0% |
| 2022 | 101 | 4 | 4% | 0% |
| 2021 | 76 | 4 | 5% | 0% |
| 2020 | 42 | 1 | 2% | 0% |
| 2019 | 34 | 0 | 0% | 0% |
Where Hpm Solar Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 184 |
| San Bernardino County | 53 |
| Riverside County | 9 |
| Orange County | 6 |
Cities and communities
- Claremont (71)
- Glendora (27)
- Rancho Cucamonga (20)
- Upland (18)
- La Verne (14)
- San Dimas (11)
- Covina (8)
- Pomona (7)
- Arcadia (7)
- Monrovia (6)
- Altadena (5)
- Diamond Bar (4)
- Whittier (4)
- Corona (4)
- Hacienda Heights (4)
- Walnut (3)
- Chino Hills (3)
- Chino (3)
- Fullerton (2)
- Eastvale (2)
- Rialto (2)
- Fontana (2)
- San Gabriel (2)
- La Mirada (2)
System sizes and prices
Hpm Solar Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 14 | |
| Total price, solar + battery | $35,400 | $30,400 – $45,850 | 88 |
| Solar size | 8.0 kW | 5.9 kW – 10.5 kW | 204 |
| Battery size | 10.0 kWh | 10.0 kWh – 15.0 kWh | 92 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Hpm Solar Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| REC | 65% |
| Enphase | 21% |
| Hyundai | 10% |
| Sinotec USA | 1% |
| Qcells | <1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 79% |
| SolarEdge | 13% |
| SunPower | 3% |
| Tesla | 1% |
| APsystems | 1% |
Contractor license
| Business name | HPM SOLAR INC |
| Status | Active |
| Classifications | C46 |
| Issued | 12/19/2018 |
| Expires | 12/31/2026 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: HPM Solar, Home Performance Matters.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.