In short
- Levion Construction LLC connected 1 home solar systems in Southern California in 2025, down 100% from 2024.
- Contractor license #1096696: check its status with CSLB.
Levion Construction LLC installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2025 | 1 | 0 | — | — |
| 2024 | 234 | 100 | 43% | 0% |
| 2023 | 385 | 17 | 4% | 0% |
Where Levion Construction LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 193 |
| Riverside County | 164 |
| Los Angeles County | 101 |
| San Diego County | 91 |
| Orange County | 66 |
| Ventura County | 5 |
Cities and communities
- Moreno Valley (36)
- San Bernardino (29)
- Fontana (29)
- Victorville (27)
- Hemet (26)
- San Diego (23)
- Hesperia (20)
- Ontario (19)
- Menifee (19)
- Chino (16)
- El Cajon (14)
- Apple Valley (13)
- Escondido (13)
- Riverside (11)
- Jurupa Valley (11)
- Fullerton (10)
- Pomona (10)
- La Mirada (10)
- Highland (9)
- Buena Park (9)
- Long Beach (8)
- Norwalk (8)
- Vista (8)
- Rancho Cucamonga (7)
System sizes and prices
Levion Construction LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $6.20/W | $4.90/W – $7.20/W | 134 |
| Total price, solar + battery | $41,650 | $29,225 – $54,650 | 100 |
| Solar size | 6.4 kW | 4.8 kW – 8.8 kW | 620 |
| Battery size | 5.0 kWh | 5.0 kWh – 10.1 kWh | 117 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Levion Construction LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 77% |
| CSISolarCo.,Ltd. | 15% |
| Jinko Solar | 3% |
| SunPower | 2% |
| Enphase | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 67% |
| SolarEdge | 19% |
| SunPower | 5% |
| Tesla | 2% |
| TigoEnergy,Inc | 2% |
Contractor license
License #1096696 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: ADVANCED ENERGY SERVICES INC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.