In short
- Lgcy Electric connected 570 home solar systems in Southern California in 2025, down 19% from 2024.
- 78% of its 2025 systems came with a battery.
- 75% were leased or on a power purchase agreement.
- Contractor license #1099095: active (CSLB).
Lgcy Electric installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 940 | 747 | 79% | 0 | 79% |
| 2025 | 570 | 446 | 78% | 2 | 75% |
| 2024 | 703 | 395 | 56% | 21 | 72% |
| 2023 | 151 | 6 | 4% | 0 | 50% |
Where Lgcy Electric installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 713 |
| Riverside County | 545 |
| Los Angeles County | 464 |
| San Diego County | 389 |
| Orange County | 240 |
| Ventura County | 13 |
Cities and communities
- Fontana (212)
- San Diego (160)
- Chino (69)
- Lancaster (63)
- Victorville (53)
- Menifee (52)
- Blythe (46)
- Chula Vista (46)
- Murrieta (45)
- Loma Linda (44)
- Hemet (44)
- Whittier (41)
- Hesperia (40)
- Riverside (39)
- San Clemente (38)
- Norwalk (37)
- Long Beach (36)
- Ontario (35)
- Corona (34)
- San Bernardino (34)
- San Jacinto (30)
- Palmdale (30)
- Temecula (30)
- Rancho Cucamonga (28)
System sizes and prices
Lgcy Electric's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $5.40/W | $3.80/W – $6.90/W | 157 |
| Total price, solar + battery | $43,600 | $26,700 – $66,300 | 65 |
| Solar size | 6.3 kW | 4.2 kW – 8.3 kW | 1,424 |
| Battery size | 10.0 kWh | 5.0 kWh – 10.1 kWh | 847 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Lgcy Electric installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 36% |
| REC | 23% |
| Mitrex | 13% |
| Canadian Solar | 12% |
| Enphase | 12% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 77% |
| SolarEdge | 9% |
| Qcells | 6% |
| Tesla | 3% |
| SunPower | 1% |
Contractor license
| Business name | LGCY ELECTRIC |
| Status | Active |
| Classifications | B| C10| C39 |
| Issued | 11/28/2022 |
| Expires | 11/30/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: LGCY INSTALLATION SERVICES, LGCY ELECTRIC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.