In short
- Lightreach connected 15 home solar systems in Southern California in 2025, down 79% from 2024.
- Contractor license #1048921: active (CSLB).
Lightreach installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 13 | 13 | — | — |
| 2025 | 15 | 8 | — | — |
| 2024 | 70 | 16 | 23% | 49% |
| 2023 | 265 | 2 | 1% | 45% |
| 2022 | 152 | 3 | 2% | 8% |
| 2021 | 5 | 0 | — | — |
Where Lightreach installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 241 |
| Riverside County | 44 |
| San Bernardino County | 39 |
| Orange County | 24 |
| Ventura County | 8 |
| San Diego County | 7 |
Cities and communities
- La Puente (63)
- Baldwin Park (27)
- Palmdale (21)
- Lancaster (15)
- Covina (13)
- West Covina (12)
- Pomona (10)
- Corona (9)
- Azusa (7)
- Hemet (6)
- Los Angeles (6)
- Santa Clarita (6)
- Ontario (5)
- Hesperia (4)
- Yucaipa (4)
- Riverside (4)
- Moreno Valley (4)
- Whittier (4)
- Long Beach (4)
- Fontana (4)
- Lakewood (4)
- Pico Rivera (4)
- Twentynine Palms (4)
- San Diego (4)
System sizes and prices
Lightreach's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.70/W | $3.00/W – $4.20/W | 24 |
| Total price, solar + battery | too few to say | 11 | |
| Solar size | 7.2 kW | 5.5 kW – 9.2 kW | 350 |
| Battery size | 9.7 kWh | 5.0 kWh – 9.7 kWh | 26 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Lightreach installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 51% |
| Qcells | 45% |
| CSISolarCo.,Ltd. | 1% |
| Generic Mfr | 1% |
| Jinko Solar | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 42% |
| SolarEdge | 38% |
| SunPower | 9% |
| Tesla | 5% |
| Delta | 1% |
Contractor license
| Business name | LIGHTREACH |
| Status | Active |
| Classifications | B| C10 |
| Issued | 01/14/2019 |
| Expires | 01/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Palmetto Solar, LIGHTREACH.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.