In short
- Mega Solar Inc connected 5 home solar systems in Southern California in 2025, down 78% from 2024.
- Contractor license #984972: active (CSLB).
Mega Solar Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 4 | 4 | — | 0 | — |
| 2025 | 5 | 4 | — | 0 | — |
| 2024 | 23 | 8 | 35% | 1 | 0% |
| 2023 | 117 | 44 | 38% | 0 | 0% |
| 2022 | 64 | 13 | 20% | 0 | 0% |
| 2021 | 8 | 1 | — | 0 | — |
| 2020 | 20 | 3 | 15% | 0 | 0% |
| 2019 | 23 | 2 | 9% | 0 | 0% |
| 2018 | 46 | 3 | 7% | 0 | 15% |
| 2017 | 15 | 0 | — | 0 | — |
Where Mega Solar Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 85 |
| San Bernardino County | 19 |
| Orange County | 17 |
| Riverside County | 16 |
| Ventura County | 12 |
Cities and communities
- Altadena (8)
- Long Beach (5)
- Westlake Village (4)
- Whittier (4)
- Irvine (4)
- Thousand Oaks (4)
- Huntington Beach (3)
- La Canada Flintridge (3)
- Corona (3)
- Palm Springs (3)
- West Covina (3)
- Lancaster (3)
- Fontana (2)
- Santa Clarita (2)
- Ventura (2)
- Apple Valley (2)
- Santa Monica (2)
- Monrovia (2)
- Yucca Valley (2)
- Claremont (2)
- Yorba Linda (2)
- Rancho Santa Margarita (2)
- Torrance (2)
- Manhattan Beach (2)
System sizes and prices
Mega Solar Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 16 | |
| Total price, solar + battery | too few to say | 11 | |
| Solar size | 9.6 kW | 8.0 kW – 12.4 kW | 145 |
| Battery size | 9.8 kWh | 9.6 kWh – 16.0 kWh | 56 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Mega Solar Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| REC | 54% |
| Qcells | 25% |
| Canadian Solar | 16% |
| Silfab | 2% |
| Hanwa Cell | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| SolarEdge | 41% |
| Enphase | 39% |
| SunPower | 8% |
| Tesla | 6% |
| Growatt | 2% |
Contractor license
| Business name | MEGA SOLAR INC |
| Status | Active |
| Classifications | C10 |
| Issued | 07/02/2013 |
| Expires | 07/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Mega Solar Inc, Mega Solar.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.