In short
- Milholland Electric Inc connected 4 home solar systems in Southern California in 2025, down 88% from 2024.
- Contractor license #585514: check its status with CSLB.
Milholland Electric Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 1 | 0 | — | 0 | — |
| 2025 | 4 | 1 | — | 0 | — |
| 2024 | 33 | 4 | 12% | 0 | 6% |
| 2023 | 517 | 27 | 5% | 12 | 1% |
| 2022 | 890 | 20 | 2% | 13 | 1% |
| 2021 | 267 | 4 | 1% | 7 | 0% |
| 2020 | 263 | 10 | 4% | 3 | 0% |
| 2019 | 293 | 5 | 2% | 1 | 0% |
| 2018 | 241 | 0 | 0% | 1 | 0% |
| 2017 | 158 | 0 | 0% | 0 | 1% |
| 2016 | 100 | 0 | 0% | 0 | 0% |
Where Milholland Electric Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 204 |
| Riverside County | 151 |
| San Bernardino County | 128 |
| Orange County | 51 |
| Los Angeles County | 21 |
Cities and communities
- San Diego (77)
- Hesperia (30)
- Desert Hot Springs (19)
- Apple Valley (19)
- Chula Vista (19)
- Perris (17)
- Oceanside (17)
- San Bernardino (15)
- Yucaipa (14)
- Corona (13)
- Moreno Valley (12)
- Escondido (12)
- El Cajon (11)
- Hemet (10)
- Riverside (10)
- Vista (10)
- Irvine (9)
- Ramona (9)
- Carlsbad (9)
- Fontana (8)
- Menifee (8)
- Cathedral City (7)
- Murrieta (7)
- Lake Elsinore (7)
System sizes and prices
Milholland Electric Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $5.20/W | $4.40/W – $6.40/W | 29 |
| Total price, solar + battery | too few to say | 4 | |
| Solar size | 6.7 kW | 5.2 kW – 9.2 kW | 554 |
| Battery size | 4.4 kWh | 3.4 kWh – 10.0 kWh | 32 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Milholland Electric Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| CertainTeed | 38% |
| SunPower | 21% |
| Canadian Solar | 19% |
| WAAREEENERGIESLIMITED | 5% |
| SEGSolarInc. | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 51% |
| SunPower | 22% |
| SolarEdge | 20% |
| Tesla | 3% |
| Growatt | 1% |
Contractor license
License #585514 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: MILHOLLAND ELECTRIC INC, Milholland Electric, Inc.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.