In short
- Murrieta Solar Power connected 1 home solar systems in Southern California in 2025.
- Contractor license #958524: active (CSLB).
Murrieta Solar Power installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2025 | 1 | 0 | — | 0 | — |
| 2024 | 4 | 2 | — | 1 | — |
| 2023 | 21 | 0 | 0% | 0 | 0% |
| 2022 | 19 | 1 | — | 0 | — |
| 2021 | 10 | 0 | — | 0 | — |
| 2020 | 17 | 0 | — | 0 | — |
| 2019 | 16 | 1 | — | 0 | — |
| 2018 | 15 | 0 | — | 0 | — |
| 2017 | 24 | 0 | 0% | 0 | 0% |
| 2016 | 23 | 0 | 0% | 0 | 0% |
Where Murrieta Solar Power installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Riverside County | 19 |
| San Diego County | 5 |
| San Bernardino County | 2 |
Cities and communities
- Murrieta (9)
- Moreno Valley (2)
- Lake Elsinore (2)
- Hemet (2)
- Temecula (2)
- San Diego (2)
- Yucaipa (1)
- Wildomar (1)
- Chino Hills (1)
- Norco (1)
- Escondido (1)
- Vista (1)
- San Marcos (1)
System sizes and prices
Murrieta Solar Power's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 3 | |
| Total price, solar + battery | too few to say | 2 | |
| Solar size | 9.9 kW | 7.1 kW – 11.0 kW | 26 |
| Battery size | too few to say | 2 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Murrieta Solar Power installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 77% |
| CSISolarCo.,Ltd. | 15% |
| Trina Solar | 4% |
| Hyundai | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 62% |
| SolarEdge | 19% |
| SunPower | 8% |
| Tesla | 8% |
| APsystems | 4% |
Contractor license
| Business name | MURRIETA SOLAR POWER |
| Status | Active |
| Classifications | C46 |
| Issued | 03/08/2011 |
| Expires | 03/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: TRIPLE LINE SOLAR, Triple Line Solar LLC-That Solar Guy.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.