In short
- Pacific Energy Network Construction connected 4 home solar systems in Southern California in 2025, down 88% from 2024.
- Contractor license #1067054: check its status with CSLB.
Pacific Energy Network Construction installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2025 | 4 | 0 | — | — |
| 2024 | 34 | 1 | 3% | 12% |
| 2023 | 44 | 0 | 0% | 9% |
| 2022 | 268 | 2 | 1% | 3% |
| 2021 | 6 | 0 | — | — |
| 2020 | 4 | 0 | — | — |
Where Pacific Energy Network Construction installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 53 |
| San Bernardino County | 22 |
| Riverside County | 4 |
| Orange County | 3 |
Cities and communities
- Palmdale (7)
- San Bernardino (5)
- Ontario (4)
- Duarte (4)
- Altadena (4)
- Lancaster (4)
- Chino Hills (4)
- Santa Clarita (3)
- El Monte (3)
- Apple Valley (3)
- Pomona (3)
- Long Beach (2)
- San Fernando (2)
- Claremont (2)
- Huntington Park (2)
- Rialto (2)
- Whittier (2)
- West Covina (2)
- Corona (1)
- Lynwood (1)
- Fullerton (1)
- Los Angeles (1)
- La Puente (1)
- Hesperia (1)
System sizes and prices
Pacific Energy Network Construction's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $6.20/W | $5.70/W – $6.70/W | 32 |
| Total price, solar + battery | too few to say | 1 | |
| Solar size | 6.3 kW | 4.7 kW – 7.9 kW | 82 |
| Battery size | too few to say | 1 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Pacific Energy Network Construction installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 80% |
| Qcells | 7% |
| LONGi | 4% |
| Silfab | 4% |
| Jinko Solar | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 39% |
| SolarEdge | 37% |
| SunPower | 15% |
| Tesla | 9% |
| SMA | 1% |
Contractor license
License #1067054 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: MODERN PRO SOLUTIONS CONSTRUCTION N, MODERN PRO SOLUTIONS CONSTRUCTION.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.