In short
- Pacific Stonegate Inc connected 2 home solar systems in Southern California in 2025, down 93% from 2024.
- Contractor license #965340: check its status with CSLB.
Pacific Stonegate Inc installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2025 | 2 | 0 | — | — |
| 2024 | 29 | 5 | 17% | 17% |
| 2023 | 120 | 6 | 5% | 1% |
| 2022 | 69 | 1 | 1% | 0% |
| 2021 | 49 | 0 | 0% | 0% |
| 2020 | 115 | 0 | 0% | 0% |
| 2019 | 92 | 0 | 0% | 1% |
| 2018 | 138 | 0 | 0% | 21% |
| 2017 | 86 | 0 | 0% | 62% |
| 2016 | 124 | 0 | 0% | 85% |
Where Pacific Stonegate Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 92 |
| Orange County | 29 |
| San Bernardino County | 23 |
| Riverside County | 7 |
Cities and communities
- Arcadia (15)
- Walnut (11)
- San Gabriel (8)
- West Covina (7)
- Ontario (7)
- Monterey Park (6)
- Chino Hills (6)
- Irvine (6)
- Yorba Linda (5)
- Temple City (5)
- Rancho Cucamonga (5)
- Rowland Heights (5)
- Placentia (4)
- Hacienda Heights (4)
- Diamond Bar (4)
- Eastvale (3)
- Huntington Beach (3)
- Mission Viejo (3)
- Pomona (3)
- Claremont (3)
- Riverside (2)
- South Pasadena (2)
- San Bernardino (2)
- La Canada Flintridge (2)
System sizes and prices
Pacific Stonegate Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.40/W | $4.00/W – $5.00/W | 24 |
| Total price, solar + battery | too few to say | 2 | |
| Solar size | 7.9 kW | 6.0 kW – 10.8 kW | 151 |
| Battery size | too few to say | 11 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Pacific Stonegate Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| SunPower | 79% |
| Aptos | 5% |
| Waaree Energies | 5% |
| Qcells | 5% |
| WAAREEENERGIESLIMITED | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 48% |
| SolarEdge | 33% |
| SunPower | 13% |
| Tesla | 3% |
| Hoymiles | 1% |
Contractor license
License #965340 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: SOLAR VAST ENERGY, Solar Vast.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.