In short
- Renova Energy Corp connected 299 home solar systems in Southern California in 2025, down 38% from 2024.
- 90% of its 2025 systems came with a battery.
- 20% were leased or on a power purchase agreement.
- Contractor license #910836: check its status with CSLB.
Renova Energy Corp installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 67 | 63 | 94% | 12% |
| 2025 | 299 | 268 | 90% | 20% |
| 2024 | 482 | 341 | 71% | 44% |
| 2023 | 1,417 | 132 | 9% | 18% |
| 2022 | 1,311 | 140 | 11% | 17% |
| 2021 | 930 | 74 | 8% | 47% |
| 2020 | 672 | 82 | 12% | 58% |
| 2019 | 691 | 46 | 7% | 64% |
| 2018 | 727 | 44 | 6% | 72% |
| 2017 | 742 | 7 | 1% | 66% |
| 2016 | 572 | 0 | 0% | 71% |
Where Renova Energy Corp installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Riverside County | 2,153 |
| San Bernardino County | 111 |
| San Diego County | 1 |
Cities and communities
- Palm Desert (626)
- Palm Springs (606)
- Rancho Mirage (357)
- Cathedral City (255)
- Indian Wells (181)
- Desert Hot Springs (95)
- Yucca Valley (53)
- Joshua Tree (32)
- Twentynine Palms (9)
- Morongo Valley (4)
- Beaumont (4)
- Calimesa (3)
- Yucaipa (3)
- Idyllwild (2)
- Rancho Cucamonga (2)
- Murrieta (2)
- Redlands (2)
- Moreno Valley (1)
- Hemet (1)
- Riverside (1)
- Blythe (1)
- Nuevo (1)
- Perris (1)
- Winchester (1)
System sizes and prices
Renova Energy Corp's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.90/W | $2.90/W – $4.40/W | 136 |
| Total price, solar + battery | $48,350 | $34,350 – $67,800 | 330 |
| Solar size | 9.7 kW | 7.2 kW – 12.7 kW | 2,198 |
| Battery size | 13.5 kWh | 13.0 kWh – 26.0 kWh | 741 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Renova Energy Corp installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| SunPower | 74% |
| Qcells | 16% |
| Meyer Burger | 5% |
| Maxeon | 3% |
| Tesla | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 63% |
| SolarEdge | 20% |
| Tesla | 8% |
| SunPower | 5% |
| Delta | 1% |
Contractor license
License #910836 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Renova Energy Corp, Renova Energy Corp..
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.