In short
- Sadler Solar Development connected 33 home solar systems in Southern California in 2025, down 20% from 2024.
- 82% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #982533: active (CSLB).
Sadler Solar Development installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 25 | 18 | 72% | 0 | 0% |
| 2025 | 33 | 27 | 82% | 0 | 0% |
| 2024 | 41 | 23 | 56% | 2 | 0% |
| 2023 | 55 | 11 | 20% | 0 | 0% |
| 2022 | 40 | 8 | 20% | 0 | 0% |
| 2021 | 30 | 9 | 30% | 0 | 0% |
| 2020 | 18 | 4 | — | 0 | — |
| 2019 | 27 | 3 | 11% | 0 | 0% |
| 2018 | 10 | 1 | — | 0 | — |
| 2017 | 12 | 0 | — | 0 | — |
| 2016 | 7 | 0 | — | 0 | — |
Where Sadler Solar Development installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Orange County | 150 |
| Los Angeles County | 3 |
| San Diego County | 1 |
Cities and communities
- Laguna Beach (73)
- Newport Beach (30)
- Dana Point (16)
- Laguna Niguel (6)
- San Clemente (6)
- San Juan Capistrano (6)
- Santa Ana (5)
- Mission Viejo (4)
- Santa Clarita (1)
- San Gabriel (1)
- Villa Park (1)
- Costa Mesa (1)
- Long Beach (1)
- Lake Forest (1)
- Laguna Hills (1)
- Valley Center (1)
System sizes and prices
Sadler Solar Development's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.30/W | $3.80/W – $5.00/W | 22 |
| Total price, solar + battery | $66,650 | $44,950 – $96,275 | 50 |
| Solar size | 8.3 kW | 5.8 kW – 11.2 kW | 129 |
| Battery size | 10.5 kWh | 9.0 kWh – 20.2 kWh | 61 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Sadler Solar Development installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| SEG Solar | 46% |
| SEGSolarInc. | 22% |
| Enphase | 10% |
| Hyundai | 9% |
| SolariaCorporation | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 81% |
| SolarEdge | 14% |
| SunPower | 2% |
| Growatt | 2% |
| Delta | 2% |
Contractor license
| Business name | SADLER SOLAR DEVELOPMENT |
| Status | Active |
| Classifications | C46 |
| Issued | 04/05/2013 |
| Expires | 04/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Sadler Solar Development, Solight Energy Solutions.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.