In short
- Sattler Engineering connected 46 home solar systems in Southern California in 2025, up 10% from 2024.
- 70% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1017484: active (CSLB).
Sattler Engineering installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 16 | 13 | — | 4 | — |
| 2025 | 46 | 32 | 70% | 32 | 0% |
| 2024 | 42 | 21 | 50% | 11 | 0% |
| 2023 | 111 | 7 | 6% | 9 | 0% |
| 2022 | 80 | 9 | 11% | 2 | 0% |
| 2021 | 57 | 4 | 7% | 0 | 0% |
| 2020 | 28 | 0 | 0% | 0 | 0% |
| 2019 | 33 | 1 | 3% | 1 | 0% |
| 2018 | 16 | 0 | — | 0 | — |
| 2017 | 17 | 0 | — | 2 | — |
| 2016 | 2 | 0 | — | 0 | — |
Where Sattler Engineering installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 211 |
| Orange County | 2 |
| Riverside County | 1 |
| Los Angeles County | 1 |
Cities and communities
- San Diego (157)
- Encinitas (9)
- Oceanside (6)
- Carlsbad (4)
- San Marcos (4)
- Escondido (4)
- Spring Valley (3)
- La Mesa (3)
- Santee (3)
- Del Mar (3)
- Chula Vista (3)
- Vista (2)
- Coronado (2)
- Alpine (2)
- Poway (2)
- Temecula (1)
- Huntington Beach (1)
- San Gabriel (1)
- Ramona (1)
- Solana Beach (1)
- Jamul (1)
- Bonita (1)
- Dana Point (1)
System sizes and prices
Sattler Engineering's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.50/W | $3.40/W – $5.80/W | 34 |
| Total price, solar + battery | $63,950 | $48,675 – $85,150 | 52 |
| Solar size | 6.1 kW | 4.6 kW – 8.4 kW | 199 |
| Battery size | 11.5 kWh | 7.7 kWh – 13.5 kWh | 60 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Sattler Engineering installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| REC | 55% |
| RECGroup | 21% |
| Panasonic | 12% |
| Hyundai | 8% |
| Qcells | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 81% |
| Tesla | 18% |
| SolarEdge | 1% |
Contractor license
| Business name | SATTLER ENGINEERING |
| Status | Active |
| Classifications | A| C10 |
| Issued | 08/23/2016 |
| Expires | 08/31/2028 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: SATTLER ENGINEERING, SATTLER SOLAR INC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.