In short
- Solar Symphony Construction Inc connected 77 home solar systems in Southern California in 2025, up 10% from 2024.
- 83% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #988146: active (CSLB).
Solar Symphony Construction Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 67 | 63 | 94% | 22 | 57% |
| 2025 | 77 | 64 | 83% | 11 | 0% |
| 2024 | 70 | 37 | 53% | 4 | 1% |
| 2023 | 248 | 12 | 5% | 1 | 0% |
| 2022 | 185 | 14 | 8% | 0 | 0% |
| 2021 | 92 | 1 | 1% | 0 | 0% |
| 2020 | 113 | 0 | 0% | 0 | 0% |
| 2019 | 216 | 4 | 2% | 0 | 0% |
| 2018 | 151 | 2 | 1% | 1 | 0% |
| 2017 | 173 | 0 | 0% | 0 | 0% |
| 2016 | 132 | 0 | 0% | 0 | 1% |
Where Solar Symphony Construction Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 263 |
| Orange County | 97 |
| Los Angeles County | 57 |
| Riverside County | 25 |
| San Bernardino County | 17 |
| Ventura County | 3 |
Cities and communities
- San Diego (125)
- Carlsbad (21)
- El Cajon (20)
- Coronado (13)
- San Marcos (12)
- Oceanside (12)
- Mission Viejo (11)
- Huntington Beach (10)
- La Mesa (10)
- Chula Vista (9)
- Escondido (9)
- Newport Beach (8)
- San Juan Capistrano (6)
- Poway (6)
- Vista (6)
- Long Beach (5)
- Hemet (5)
- Ontario (5)
- Lakeside (5)
- Santa Ana (4)
- Garden Grove (4)
- Fullerton (4)
- Rancho Palos Verdes (4)
- San Clemente (4)
System sizes and prices
Solar Symphony Construction Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.50/W | $3.10/W – $4.00/W | 45 |
| Total price, solar + battery | $44,900 | $36,100 – $63,150 | 99 |
| Solar size | 6.6 kW | 5.2 kW – 8.9 kW | 395 |
| Battery size | 13.5 kWh | 10.5 kWh – 13.5 kWh | 113 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Solar Symphony Construction Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 64% |
| SolariaCorporation | 6% |
| JA Solar | 5% |
| Aptos | 4% |
| United Renewable Energy | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 73% |
| Tesla | 19% |
| SolarEdge | 6% |
| SunPower | 1% |
| Fronius | <1% |
Contractor license
| Business name | SOLAR SYMPHONY CONSTRUCTION INC |
| Status | Active |
| Classifications | B| C46 |
| Issued | 10/31/2013 |
| Expires | 10/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: SOLAR SYMPHONY CONSTRUCTION INC, Solar Symphony Construction Inc..
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.