In short
- Sun Energy Construction connected 4 home solar systems in Southern California in 2025.
- Contractor license #1043184: check its status with CSLB.
Sun Energy Construction installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2025 | 4 | 0 | — | — |
| 2024 | 10 | 2 | — | — |
| 2023 | 183 | 11 | 6% | 1% |
| 2022 | 191 | 21 | 11% | 0% |
| 2021 | 177 | 6 | 3% | 0% |
| 2020 | 89 | 0 | 0% | 0% |
| 2019 | 47 | 0 | 0% | 0% |
| 2018 | 18 | 0 | — | — |
Where Sun Energy Construction installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 88 |
| Los Angeles County | 56 |
| Orange County | 27 |
| Riverside County | 25 |
| Ventura County | 1 |
Cities and communities
- Victorville (8)
- Rancho Cucamonga (8)
- San Bernardino (8)
- Fontana (6)
- Ontario (6)
- Rialto (6)
- Covina (6)
- Corona (5)
- Apple Valley (5)
- Upland (5)
- Huntington Beach (5)
- Norwalk (5)
- Hesperia (5)
- West Covina (4)
- Fullerton (4)
- Eastvale (4)
- Yorba Linda (4)
- Highland (4)
- Long Beach (4)
- La Puente (4)
- Glendora (4)
- Riverside (3)
- Grand Terrace (3)
- Claremont (3)
System sizes and prices
Sun Energy Construction's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 12 | |
| Total price, solar + battery | too few to say | 2 | |
| Solar size | 7.9 kW | 6.4 kW – 9.9 kW | 197 |
| Battery size | too few to say | 13 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Sun Energy Construction installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 80% |
| United Renewable Energy | 8% |
| Qcells | 5% |
| Aptos | 3% |
| REC | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 46% |
| SolarEdge | 30% |
| SunPower | 10% |
| Tesla | 5% |
| Growatt | 4% |
Contractor license
License #1043184 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Sun Energy Co, Sun Energy Construction.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.