In short
- Sungenia Solar Construction connected 44 home solar systems in Southern California in 2025, up 19% from 2024.
- 77% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #998985: active (CSLB).
Sungenia Solar Construction installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 14 | 11 | — | 2 | — |
| 2025 | 44 | 34 | 77% | 4 | 0% |
| 2024 | 37 | 12 | 32% | 5 | 0% |
| 2023 | 81 | 2 | 2% | 3 | 0% |
| 2022 | 75 | 5 | 7% | 0 | 0% |
| 2021 | 44 | 0 | 0% | 0 | 0% |
| 2020 | 40 | 0 | 0% | 0 | 0% |
| 2019 | 56 | 0 | 0% | 0 | 0% |
| 2018 | 37 | 1 | 3% | 0 | 0% |
| 2017 | 32 | 0 | 0% | 0 | 0% |
| 2016 | 15 | 0 | — | 0 | — |
Where Sungenia Solar Construction installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Diego County | 174 |
| Riverside County | 1 |
| Orange County | 1 |
Cities and communities
- San Diego (44)
- Rancho Santa Fe (30)
- Poway (26)
- Encinitas (9)
- Ramona (8)
- Fallbrook (7)
- Carlsbad (6)
- Coronado (6)
- Del Mar (5)
- Chula Vista (4)
- Bonsall (4)
- Vista (4)
- San Marcos (3)
- Solana Beach (3)
- Bonita (3)
- Oceanside (3)
- Escondido (2)
- Lakeside (2)
- Santee (2)
- Murrieta (1)
- Julian (1)
- Pauma Valley (1)
- El Cajon (1)
- Dana Point (1)
System sizes and prices
Sungenia Solar Construction's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.20/W | $3.80/W – $5.20/W | 35 |
| Total price, solar + battery | $95,900 | $70,500 – $179,000 | 46 |
| Solar size | 7.5 kW | 5.3 kW – 14.0 kW | 162 |
| Battery size | 11.5 kWh | 11.5 kWh – 23.0 kWh | 48 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Sungenia Solar Construction installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 36% |
| UnitedRenewableEnergyCo.,Ltd. | 26% |
| Silfab | 18% |
| Hyundai | 12% |
| Panasonic | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 59% |
| Tesla | 27% |
| SolarEdge | 14% |
| Sol-Ark | 1% |
Contractor license
| Business name | SUNGENIA SOLAR CONSTRUCTION |
| Status | Active |
| Classifications | B| C10 |
| Issued | 12/04/2014 |
| Expires | 12/31/2026 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: SUNGENIA SOLAR SOLUTIONS, SUNGENIA SOLAR CONSTRUCTION.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.