In short
- T & G Roofing And Solar Electric Company connected 27 home solar systems in Southern California in 2025.
- 81% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #583458: active (CSLB).
T & G Roofing And Solar Electric Company installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 6 | 6 | — | — |
| 2025 | 27 | 22 | 81% | 0% |
| 2024 | 17 | 9 | — | — |
| 2023 | 55 | 0 | 0% | 0% |
| 2022 | 56 | 0 | 0% | 0% |
| 2021 | 39 | 0 | 0% | 0% |
| 2020 | 29 | 0 | 0% | 0% |
| 2019 | 33 | 0 | 0% | 0% |
| 2018 | 28 | 0 | 0% | 0% |
| 2017 | 34 | 0 | 0% | 0% |
| 2016 | 26 | 0 | 0% | 0% |
Where T & G Roofing And Solar Electric Company installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 74 |
| Los Angeles County | 24 |
| Riverside County | 4 |
| Orange County | 3 |
Cities and communities
- Rancho Cucamonga (43)
- Upland (15)
- Claremont (11)
- Redlands (3)
- Yucaipa (3)
- Walnut (3)
- Ontario (3)
- Chino Hills (2)
- La Verne (2)
- West Covina (2)
- Chino (2)
- Fontana (2)
- Pomona (2)
- Corona (2)
- Apple Valley (1)
- Moreno Valley (1)
- Rowland Heights (1)
- Eastvale (1)
- Altadena (1)
- Sierra Madre (1)
- Diamond Bar (1)
- Santa Ana (1)
- Orange (1)
- San Clemente (1)
System sizes and prices
T & G Roofing And Solar Electric Company's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 13 | |
| Total price, solar + battery | $49,900 | $40,800 – $61,875 | 30 |
| Solar size | 8.7 kW | 7.1 kW – 10.4 kW | 99 |
| Battery size | 15.0 kWh | 10.0 kWh – 25.0 kWh | 31 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment T & G Roofing And Solar Electric Company installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 71% |
| Enphase | 25% |
| REC | 2% |
| Jinko Solar | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 69% |
| SolarEdge | 17% |
| SunPower | 8% |
| Growatt | 3% |
| Tesla | 3% |
Contractor license
| Business name | T & G ROOFING AND SOLAR ELECTRIC COMPANY |
| Status | Active |
| Classifications | B| C10 |
| Issued | 12/22/1989 |
| Expires | 02/28/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: T & G ROOFING COMPANY INC, T&G Roofing Company.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.