In short
- 18 new home solar systems were connected in Boulevard in 2025.
Solar installs in Boulevard by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 8 | 7 | — | — |
| 2025 | 18 | 16 | — | — |
| 2024 | 19 | 15 | — | — |
| 2023 | 19 | 2 | — | — |
| 2022 | 10 | 0 | — | — |
| 2021 | 13 | 1 | — | — |
| 2020 | 11 | 0 | — | — |
| 2019 | 11 | 0 | — | — |
| 2018 | 9 | 1 | — | — |
| 2017 | 14 | 0 | — | — |
| 2016 | 20 | 0 | 0% | 40% |
Net billing (NEM 3.0) began for SCE and SDG&E customers on Apr 15, 2023; most new systems since then include a battery.
What solar costs in Boulevard
Prices owners reported to the utility in 2024–2025, before incentives. The federal tax credit for homeowners ended Dec 31, 2025, so 2026 buyers pay these prices less any local rebate (see what's left).
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 5 | |
| Total price, solar + battery | too few to say | 10 | |
| Solar size | 6.3 kW | 4.8 kW – 8.7 kW | 56 |
| Battery size | 11.5 kWh | 7.6 kWh – 12.0 kWh | 33 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
How much a system here produces
Modeled for the East San Diego County climate, each kilowatt of south-facing panels makes about 1,730 kWh a year, so a median-size 6.3 kW system makes about 10,900 kWh a year. Source: PVWatts (National Laboratory of the Rockies), 20° tilt, 14% losses. Shade, roof direction and panel type change real output.
Who installs solar in Boulevard
Installers ranked by home systems connected in 2023–2025, from public records. This isn't an endorsement, and no one can pay to change the ranking. Check any license before you sign (how).
| Installer | Systems | CSLB license |
|---|---|---|
| Sunrun | 11 | #750184 active |
| Semper Solaris | 9 | #978152 active |
| Freedom Solar Co | 8 | #1124448 check status |
| Infinity Energy, Inc | 6 | #998627 check status |
| Grid Alternatives | 3 | #867533 active |
| Bright Ops | 3 | #1020761 listed as: susp - no qualifier |
| Freedom Solar Co | 2 | #1029644 check status |
| Solcius | 1 | #976336 check status |
| Milholland Electric Inc | 1 | #585514 check status |
| ESP Contracting | 1 | #619149 listed as: contr bond susp |
Equipment installed in Boulevard
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 30% |
| Silfab | 18% |
| CSISolarCo.,Ltd. | 16% |
| JA Solar | 5% |
| Trina Solar | 5% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 39% |
| SolarEdge | 34% |
| Tesla | 21% |
| Delta | 4% |
| SunPower | 2% |
Your utility and solar billing
- SDG&E: Net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.
Solar permits in Boulevard
Permits come from San Diego County or the city your address is in; your installer pulls them.
State law caps a home solar permit fee at $450 plus $15 per kW above 15 kW (Gov. Code §66015), and requires larger cities to offer instant online permits for home solar and paired batteries up to 38.4 kW (SB 379). Your installer normally pulls the permit. How solar permits work.
SolarAPP+ list checked Oct 1, 2026.
Questions about solar in Boulevard
How many homes in Boulevard have solar?
174 home solar systems are on record in Boulevard since 2003, including 18 connected in 2025.
Who installs the most solar in Boulevard?
By public records, Sunrun connected the most home solar systems in Boulevard in 2023–2025. Rankings here are by count only; no one can pay to change them.
Which utility serves Boulevard?
San Diego Gas & Electric (SDG&E): net billing (the Solar Billing Plan) for systems that applied after Apr 14, 2023.
About this data
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.