In short
- New solar goes on the Solar Billing Plan (the CPUC's Net Billing Tariff): hourly generation and delivery export credits that vary by hour and season, locked for 9 years. Credits roll over month to month but can't pay non-bypassable charges.
- Solar Billing Plan customers are on the EV-TOU-5 rate. Peak is 4–9 p.m. on SDG&E's time-of-use plans. The EV-TOU-5 peak price is 80.2¢ per kWh (effective Aug 1, 2026), so a battery that covers your evening use saves a lot here.
- Every SDG&E plan has a Base Services Charge of about $24 a month since Oct 2025 ($6 for CARE, $12 for FERA).
- NEM 1.0 and 2.0 customers move to the Solar Billing Plan at the end of their 20-year legacy period.
Rebates and incentives
SGIP battery incentives (administered here by the Center for Sustainable Energy): the general and resiliency budgets are closed; the income-qualified equity budget is on a waitlist (Nov 5, 2026).
Getting connected
Apply through SDG&E's online solar application portal. SDG&E says permission to operate "usually takes up to five business days" after a complete submission.
SDG&E home solar by year
From utility interconnection records (California DG Stats), through Aug 31, 2026.
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 7,184 | 5,411 | 75% | 1,392 | 36% |
| 2025 | 13,811 | 9,843 | 71% | 2,455 | 34% |
| 2024 | 15,722 | 8,231 | 52% | 1,982 | 36% |
| 2023 | 36,492 | 3,152 | 9% | 2,183 | 18% |
| 2022 | 31,618 | 3,159 | 10% | 1,380 | 19% |
| 2021 | 22,197 | 2,190 | 10% | 1,300 | 21% |
| 2020 | 23,442 | 1,347 | 6% | 846 | 30% |
| 2019 | 26,806 | 1,488 | 6% | 954 | 25% |
| 2018 | 20,387 | 1,401 | 7% | 604 | 20% |
| 2017 | 15,677 | 245 | 2% | 97 | 22% |
| 2016 | 25,444 | 10 | <1% | 17 | 29% |
What solar costs in SDG&E territory
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $4.10/W | $3.30/W – $4.70/W | 9,041 |
| Total price, solar + battery | $71,200 | $57,175 – $97,025 | 8,712 |
| Solar size | 5.3 kW | 3.8 kW – 7.4 kW | 66,025 |
| Battery size | 7.7 kWh | 5.0 kWh – 11.5 kWh | 21,226 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Cities served
- Aliso Viejo (part)
- Carlsbad
- Chula Vista
- Coronado
- Dana Point
- Del Mar
- El Cajon
- Encinitas
- Escondido
- Imperial Beach
- La Mesa
- Laguna Hills (part)
- Laguna Niguel
- Lake Forest (part)
- Lemon Grove
- Mission Viejo (part)
- National City
- Oceanside
- Poway
- Rancho Santa Margarita (part)
- San Clemente
- San Diego
- San Juan Capistrano
- San Marcos
- Santee
- Solana Beach
- Vista
Sources
Checked at each utility's own pages on Oct 1, 2026. Rules and rebates change: confirm with the utility before you sign a contract.
About this data
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.