In short
- Ameco Solar LLC connected 274 home solar systems in Southern California in 2025, up 42% from 2024.
- 90% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1053172: active (CSLB).
Ameco Solar LLC installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 250 | 231 | 92% | 1 | 4% |
| 2025 | 274 | 247 | 90% | 1 | 0% |
| 2024 | 193 | 144 | 75% | 0 | 0% |
| 2023 | 485 | 49 | 10% | 4 | 0% |
| 2022 | 367 | 23 | 6% | 0 | 0% |
| 2021 | 150 | 0 | 0% | 0 | 0% |
| 2020 | 52 | 0 | 0% | 0 | 0% |
| 2019 | 26 | 0 | 0% | 0 | 0% |
Where Ameco Solar LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 666 |
| Orange County | 221 |
| Ventura County | 114 |
| San Bernardino County | 99 |
| Riverside County | 65 |
| San Diego County | 37 |
Cities and communities
- Long Beach (64)
- Santa Clarita (52)
- Redondo Beach (29)
- Torrance (28)
- Thousand Oaks (27)
- Whittier (23)
- Rancho Palos Verdes (22)
- Simi Valley (22)
- Huntington Beach (21)
- Irvine (18)
- Lakewood (17)
- Costa Mesa (17)
- Fullerton (17)
- Claremont (16)
- Orange (16)
- Oxnard (16)
- Rancho Cucamonga (15)
- Camarillo (15)
- Downey (15)
- Altadena (15)
- San Diego (15)
- Manhattan Beach (14)
- Upland (14)
- Los Angeles (12)
System sizes and prices
Ameco Solar LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.50/W | $3.10/W – $4.10/W | 74 |
| Total price, solar + battery | $32,000 | $24,000 – $42,375 | 382 |
| Solar size | 7.6 kW | 6.0 kW – 9.7 kW | 952 |
| Battery size | 13.5 kWh | 10.0 kWh – 13.5 kWh | 440 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Ameco Solar LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| REC | 55% |
| SEG Solar | 19% |
| Enphase | 10% |
| Hyundai | 8% |
| Qcells | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 56% |
| SolarEdge | 19% |
| Tesla | 16% |
| SunPower | 6% |
| Growatt | 1% |
Contractor license
| Business name | AMECO SOLAR LLC |
| Status | Active |
| Classifications | B| C10 |
| Issued | 05/06/2019 |
| Expires | 05/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Ameco Solar, Ameco Solar LLC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.