In short
- Bright Life Remodeling connected 21 home solar systems in Southern California in 2025.
- 57% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1029267: active (CSLB).
Bright Life Remodeling installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 10 | 7 | — | 0 | — |
| 2025 | 21 | 12 | 57% | 0 | 0% |
| 2024 | 13 | 3 | — | 0 | — |
| 2023 | 43 | 13 | 30% | 0 | 0% |
| 2022 | 71 | 17 | 24% | 0 | 0% |
| 2021 | 41 | 6 | 15% | 0 | 0% |
| 2020 | 55 | 15 | 27% | 0 | 0% |
| 2019 | 54 | 8 | 15% | 1 | 0% |
| 2018 | 72 | 8 | 11% | 0 | 0% |
| 2017 | 16 | 0 | — | 0 | — |
Where Bright Life Remodeling installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Orange County | 80 |
| Los Angeles County | 4 |
| San Bernardino County | 1 |
| Riverside County | 1 |
| San Diego County | 1 |
Cities and communities
- Newport Beach (37)
- Huntington Beach (7)
- Dana Point (7)
- Costa Mesa (5)
- Laguna Beach (4)
- Irvine (3)
- Santa Ana (2)
- Fullerton (2)
- San Clemente (2)
- Rolling Hills Estates (1)
- Buena Park (1)
- Chino (1)
- Orange (1)
- Rancho Santa Margarita (1)
- Placentia (1)
- Moreno Valley (1)
- San Marino (1)
- Fountain Valley (1)
- Diamond Bar (1)
- Aliso Viejo (1)
- Mission Viejo (1)
- Westminster (1)
- Compton (1)
- Tustin (1)
System sizes and prices
Bright Life Remodeling's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 19 | |
| Total price, solar + battery | too few to say | 14 | |
| Solar size | 7.4 kW | 4.0 kW – 11.1 kW | 77 |
| Battery size | 26.4 kWh | 13.2 kWh – 27.0 kWh | 28 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Bright Life Remodeling installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Solaria | 43% |
| United Renewable Energy | 18% |
| Panasonic | 9% |
| SolariaCorporation | 5% |
| REC | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 64% |
| SolarEdge | 16% |
| SunPower | 9% |
| Tesla | 9% |
| ENPASE ENERGY | 1% |
Contractor license
| Business name | BRIGHT LIFE REMODELING |
| Status | Active |
| Classifications | B| C39| C46 |
| Issued | 07/25/2017 |
| Expires | 07/31/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: BRIGHT LIFE SOLAR INC, Bright Life Solar.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.