In short
- Clean Initiative LLC connected no home solar systems in Southern California in 2025 or since; its latest was in 2024. If it installed yours, see what to do when an installer stops.
- Contractor license #1038376: check its status with CSLB.
Clean Initiative LLC installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2024 | 31 | 2 | 6% | 39% |
| 2023 | 146 | 19 | 13% | 25% |
| 2022 | 96 | 7 | 7% | 2% |
| 2021 | 191 | 1 | 1% | 8% |
| 2020 | 106 | 0 | 0% | 35% |
| 2019 | 213 | 2 | 1% | 40% |
| 2018 | 74 | 0 | 0% | 1% |
Where Clean Initiative LLC installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 110 |
| Orange County | 35 |
| Riverside County | 20 |
| San Bernardino County | 11 |
| Ventura County | 1 |
Cities and communities
- West Covina (12)
- Whittier (11)
- Downey (9)
- Altadena (8)
- Norwalk (7)
- La Puente (7)
- Buena Park (6)
- Covina (6)
- Fullerton (5)
- Los Angeles (5)
- San Bernardino (4)
- Placentia (4)
- Santa Ana (4)
- Santa Fe Springs (4)
- Montebello (4)
- Corona (3)
- Torrance (3)
- Brea (3)
- Moreno Valley (3)
- Fontana (2)
- San Gabriel (2)
- Murrieta (2)
- Cypress (2)
- Temecula (2)
System sizes and prices
Clean Initiative LLC's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 17 | |
| Total price, solar + battery | too few to say | 1 | |
| Solar size | 5.8 kW | 4.4 kW – 8.0 kW | 177 |
| Battery size | 10.1 kWh | 9.7 kWh – 10.1 kWh | 21 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Clean Initiative LLC installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 38% |
| Hyundai | 32% |
| Qcells | 16% |
| GAF | 3% |
| LG | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 59% |
| SolarEdge | 28% |
| SunPower | 5% |
| Tesla | 3% |
| Delta | 2% |
Contractor license
License #1038376 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Clean Initiative, CLEAN INITIATIVE.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.