In short
- Green Day Power connected 17 home solar systems in Southern California in 2025, down 70% from 2024.
- Contractor license #1038673: check its status with CSLB.
Green Day Power installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 1 | 0 | — | 0 | — |
| 2025 | 17 | 1 | — | 0 | — |
| 2024 | 57 | 3 | 5% | 1 | 14% |
| 2023 | 231 | 4 | 2% | 2 | <1% |
| 2022 | 276 | 25 | 9% | 1 | 7% |
| 2021 | 245 | 5 | 2% | 1 | 0% |
| 2020 | 127 | 5 | 4% | 0 | 3% |
| 2019 | 21 | 0 | 0% | 0 | 29% |
Where Green Day Power installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 130 |
| San Bernardino County | 53 |
| Riverside County | 41 |
| San Diego County | 36 |
| Orange County | 34 |
| Ventura County | 12 |
Cities and communities
- Baldwin Park (22)
- La Puente (21)
- Palmdale (17)
- Chula Vista (10)
- San Diego (10)
- Santa Clarita (9)
- Covina (7)
- San Bernardino (6)
- Menifee (6)
- Lancaster (6)
- Apple Valley (6)
- Port Hueneme (5)
- Whittier (5)
- Ontario (5)
- Fontana (5)
- Escondido (5)
- Norwalk (4)
- Corona (4)
- West Covina (4)
- Pomona (4)
- Orange (4)
- Costa Mesa (4)
- Jurupa Valley (4)
- Thousand Oaks (4)
System sizes and prices
Green Day Power's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.80/W | $3.00/W – $5.10/W | 58 |
| Total price, solar + battery | too few to say | 3 | |
| Solar size | 7.3 kW | 5.2 kW – 9.9 kW | 305 |
| Battery size | too few to say | 8 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Green Day Power installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 59% |
| Qcells | 23% |
| Vietnam Sunergy | 8% |
| CSISolarCo.,Ltd. | 6% |
| REC | 1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 58% |
| SolarEdge | 33% |
| SunPower | 4% |
| Growatt | 2% |
| Tesla | 1% |
Contractor license
License #1038673 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Green Day Power, Powur.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.