In short

Green Day Power installs by year

YearNew solar systemsWith a batteryBattery shareBatteries added laterLeased or PPA
2026 (through Aug 31)10—0—
2025171—0—
20245735%114%
202323142%2<1%
2022276259%17%
202124552%10%
202012754%03%
20192100%029%

Where Green Day Power installs

Home systems connected in 2023–2025, by county:

CountySystems
Los Angeles County130
San Bernardino County53
Riverside County41
San Diego County36
Orange County34
Ventura County12

Cities and communities

System sizes and prices

Green Day Power's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.

FigureMedianMiddle halfSystems
Price per watt, solar only$3.80/W$3.00/W – $5.10/W58
Total price, solar + batterytoo few to say3
Solar size7.3 kW5.2 kW – 9.9 kW305
Battery sizetoo few to say8

Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).

Equipment Green Day Power installs

The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.

Solar panelsShare of systems
Canadian Solar59%
Qcells23%
Vietnam Sunergy8%
CSISolarCo.,Ltd.6%
REC1%
Inverter or battery systemShare of systems
Enphase58%
SolarEdge33%
SunPower4%
Growatt2%
Tesla1%

Comparing home batteries →

Contractor license

License #1038673 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.

See the live CSLB record →

License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.

Also filed as: Green Day Power, Powur.

About this data