In short
- Lift Energy Construction Inc connected 2 home solar systems in Southern California in 2025, down 98% from 2024.
- Contractor license #1030273: check its status with CSLB.
Lift Energy Construction Inc installs by year
| Year | New solar systems | With a battery | Battery share | Batteries added later | Leased or PPA |
|---|---|---|---|---|---|
| 2026 (through Aug 31) | 1 | 0 | — | 0 | — |
| 2025 | 2 | 1 | — | 0 | — |
| 2024 | 96 | 1 | 1% | 0 | 11% |
| 2023 | 829 | 1 | <1% | 1 | 9% |
| 2022 | 1,164 | 5 | <1% | 0 | 13% |
| 2021 | 668 | 6 | 1% | 0 | 34% |
| 2020 | 223 | 0 | 0% | 0 | 71% |
| 2019 | 22 | 0 | 0% | 0 | 100% |
| 2018 | 1 | 0 | — | 0 | — |
| 2017 | 2 | 0 | — | 0 | — |
Where Lift Energy Construction Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Orange County | 243 |
| San Bernardino County | 235 |
| Los Angeles County | 208 |
| San Diego County | 86 |
| Ventura County | 84 |
| Riverside County | 72 |
Cities and communities
- Huntington Beach (50)
- Victorville (48)
- Rialto (37)
- Santa Clarita (35)
- Hesperia (29)
- Fontana (27)
- Thousand Oaks (23)
- Simi Valley (20)
- Ontario (19)
- Fountain Valley (18)
- Long Beach (17)
- Oceanside (17)
- San Diego (17)
- Santa Ana (16)
- Westminster (16)
- Mission Viejo (15)
- Moreno Valley (15)
- Orange (14)
- Apple Valley (14)
- Costa Mesa (14)
- Dana Point (14)
- Oxnard (13)
- Torrance (13)
- Cypress (12)
System sizes and prices
Lift Energy Construction Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $5.70/W | $4.60/W – $6.90/W | 83 |
| Total price, solar + battery | too few to say | 2 | |
| Solar size | 7.1 kW | 5.2 kW – 9.2 kW | 927 |
| Battery size | too few to say | 3 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Lift Energy Construction Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 98% |
| SunPower | 1% |
| Canadian Solar | 1% |
| REC | <1% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 57% |
| SolarEdge | 27% |
| SunPower | 6% |
| Tesla | 4% |
| Delta | 1% |
Contractor license
License #1030273 isn't in the license file we downloaded from the state contractor board, so we can't show its status here. Check the live record below; a company can also hold more than one license.
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Lift Energy Construction Inc, LIFT ENERGY INC.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.