In short
- Nexgen Construction Services Inc connected 7 home solar systems in Southern California in 2025, down 78% from 2024.
- Contractor license #933867: listed as: work comp susp (CSLB).
Nexgen Construction Services Inc installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 1 | 0 | — | — |
| 2025 | 7 | 4 | — | — |
| 2024 | 32 | 19 | 59% | 0% |
| 2023 | 85 | 13 | 15% | 0% |
| 2022 | 60 | 13 | 22% | 0% |
| 2021 | 61 | 13 | 21% | 0% |
| 2020 | 37 | 1 | 3% | 0% |
| 2019 | 43 | 0 | 0% | 0% |
| 2018 | 43 | 0 | 0% | 0% |
| 2017 | 34 | 0 | 0% | 0% |
| 2016 | 26 | 0 | 0% | 0% |
Where Nexgen Construction Services Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Orange County | 65 |
| Los Angeles County | 59 |
| Riverside County | 1 |
Cities and communities
- Long Beach (38)
- Los Alamitos (17)
- Cypress (13)
- Seal Beach (9)
- Huntington Beach (6)
- Cerritos (5)
- Garden Grove (5)
- Lakewood (5)
- Rancho Palos Verdes (4)
- Costa Mesa (2)
- Bellflower (2)
- Orange (2)
- San Clemente (2)
- Villa Park (1)
- Yorba Linda (1)
- Artesia (1)
- Lawndale (1)
- Buena Park (1)
- Corona (1)
- Westminster (1)
- Fountain Valley (1)
- La Mirada (1)
- Fullerton (1)
- Mission Viejo (1)
System sizes and prices
Nexgen Construction Services Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 16 | |
| Total price, solar + battery | $45,700 | $33,250 – $60,600 | 23 |
| Solar size | 7.1 kW | 4.8 kW – 8.8 kW | 124 |
| Battery size | 15.0 kWh | 10.1 kWh – 20.0 kWh | 36 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Nexgen Construction Services Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Solaria | 58% |
| Enphase | 16% |
| United Renewable Energy | 10% |
| REC | 8% |
| Qcells | 2% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 59% |
| SolarEdge | 27% |
| SunPower | 6% |
| Tesla | 2% |
| Hoymiles | 2% |
Contractor license
| Business name | NEXGEN CONSTRUCTION SERVICES INC |
| Status | Listed as: Work Comp Susp |
| Classifications | B| C10 |
| Issued | 06/12/2009 |
| Expires | 06/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: NexGen Construction Services, Inc., NEXGEN CONSTRUCTION.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.