In short
- Pacific Allied Group Inc connected 20 home solar systems in Southern California in 2025, down 75% from 2024.
- 90% of its 2025 systems came with a battery.
- 60% were leased or on a power purchase agreement.
- Contractor license #1083866: active (CSLB).
Pacific Allied Group Inc installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 21 | 19 | 90% | 57% |
| 2025 | 20 | 18 | 90% | 60% |
| 2024 | 81 | 71 | 88% | 67% |
| 2023 | 148 | 13 | 9% | 5% |
| 2022 | 72 | 1 | 1% | 0% |
Where Pacific Allied Group Inc installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| San Bernardino County | 151 |
| Riverside County | 74 |
| Los Angeles County | 30 |
| Orange County | 10 |
| San Diego County | 5 |
Cities and communities
- Fontana (33)
- San Bernardino (19)
- Victorville (15)
- Highland (12)
- Hesperia (10)
- Hemet (10)
- Moreno Valley (10)
- Rialto (8)
- Apple Valley (7)
- Perris (7)
- Riverside (7)
- Beaumont (5)
- Yucaipa (5)
- Corona (5)
- Phelan (5)
- Bloomington (5)
- Ontario (5)
- Palmdale (4)
- Redlands (4)
- Adelanto (4)
- Rancho Cucamonga (4)
- Murrieta (3)
- Montclair (3)
- Menifee (3)
System sizes and prices
Pacific Allied Group Inc's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | too few to say | 9 | |
| Total price, solar + battery | $43,500 | $35,700 – $52,900 | 25 |
| Solar size | 7.6 kW | 6.0 kW – 9.5 kW | 249 |
| Battery size | 5.0 kWh | 5.0 kWh – 10.0 kWh | 102 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Pacific Allied Group Inc installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Canadian Solar | 78% |
| Qcells | 6% |
| Enphase | 4% |
| JA Solar | 3% |
| Aptos | 3% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 69% |
| SolarEdge | 23% |
| SunPower | 5% |
| Tesla | 1% |
| ABB | 1% |
Contractor license
| Business name | PACIFIC ALLIED GROUP INC |
| Status | Active |
| Classifications | A| B |
| Issued | 11/19/2021 |
| Expires | 11/30/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Pacific Allied Group.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.