In short
- Silverline Solar connected 20 home solar systems in Southern California in 2025, down 51% from 2024.
- 90% of its 2025 systems came with a battery.
- 0% were leased or on a power purchase agreement.
- Contractor license #1001143: active (CSLB).
Silverline Solar installs by year
| Year | New solar systems | With a battery | Battery share | Leased or PPA |
|---|---|---|---|---|
| 2026 (through Aug 31) | 7 | 7 | — | — |
| 2025 | 20 | 18 | 90% | 0% |
| 2024 | 41 | 19 | 46% | 0% |
| 2023 | 139 | 14 | 10% | 0% |
| 2022 | 101 | 6 | 6% | 0% |
| 2021 | 55 | 2 | 4% | 0% |
| 2020 | 50 | 0 | 0% | 0% |
| 2019 | 57 | 0 | 0% | 0% |
| 2018 | 23 | 0 | 0% | 4% |
| 2017 | 13 | 0 | — | — |
Where Silverline Solar installs
Home systems connected in 2023–2025, by county:
| County | Systems |
|---|---|
| Los Angeles County | 53 |
| Orange County | 38 |
| San Diego County | 33 |
| Riverside County | 32 |
| Ventura County | 31 |
| San Bernardino County | 20 |
Cities and communities
- San Diego (10)
- Thousand Oaks (7)
- Simi Valley (6)
- Camarillo (6)
- Cathedral City (5)
- Calabasas (5)
- Corona (4)
- Riverside (4)
- Winchester (4)
- Fountain Valley (4)
- Redondo Beach (4)
- Oceanside (4)
- Whittier (3)
- Ventura (3)
- Santa Clarita (3)
- Beaumont (3)
- Costa Mesa (3)
- Moorpark (3)
- Agoura Hills (3)
- Long Beach (3)
- Chula Vista (3)
- Poway (3)
- Victorville (2)
- Ontario (2)
System sizes and prices
Silverline Solar's systems in 2023–2025; prices are what owners reported for systems they bought, 2024–2025, before incentives.
| Figure | Median | Middle half | Systems |
|---|---|---|---|
| Price per watt, solar only | $3.00/W | $2.60/W – $3.30/W | 24 |
| Total price, solar + battery | $48,500 | $35,900 – $59,175 | 36 |
| Solar size | 7.8 kW | 5.6 kW – 10.6 kW | 200 |
| Battery size | 13.5 kWh | 10.1 kWh – 17.6 kWh | 51 |
Middle half: the range covering the middle 50% of records (a quarter were lower, a quarter higher).
Equipment Silverline Solar installs
The most common brands on new home systems in 2023–2025, as filed with the utility. Tesla inverters are mostly Powerwall systems.
| Solar panels | Share of systems |
|---|---|
| Qcells | 49% |
| Canadian Solar | 28% |
| CSISolarCo.,Ltd. | 8% |
| Hyundai | 6% |
| Enphase | 4% |
| Inverter or battery system | Share of systems |
|---|---|
| Enphase | 55% |
| SolarEdge | 22% |
| Tesla | 10% |
| SunPower | 9% |
| Delta | 2% |
Contractor license
| Business name | SILVERLINE SOLAR |
| Status | Active |
| Classifications | B| C10| C46 |
| Issued | 02/13/2015 |
| Expires | 02/28/2027 |
License status from the CSLB license file we downloaded; that file doesn't include every current license, so "check status" means only that it wasn't in our copy. Always check the live record before you sign: statuses change.
Also filed as: Solar Service LA, SILVERLINE SOLAR.
About this data
- Counts are systems where this license number was filed as the installer; a company that also works under another license is shown separately.
- Counts are home solar systems the utility connected (gave permission to operate), by year of approval. Commercial systems and changes to existing systems aren't counted as new.
- Prices are what owners reported to the utility for systems they bought (not leases or PPAs), before incentives. Prices under $1.50 or over $12 per watt are left out as entry errors.
- A battery counts with a solar system when it was filed with it; batteries added to older systems are counted separately as "added later". SDG&E files batteries separately: we match them to the solar application filed with them.
- Utility records name the place by postal city, so a community's numbers can include homes just outside city limits.